Similar Projects
UMA Bangor Walkway Project – Phase II
Infrastructure
Bidding
Augusta, ME

Miles Street Reconstruction and Sidewalk Project
Infrastructure
Bidding
Damariscotta, ME 04543

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Bangor, ME 04401

Sidewalk Renovation Project at EMCC Penquis Higher Education Center
Post-Bid
Dover Foxcroft, ME

Portland - Region 1 Signal Improvements and Sidewalk Ramp Reconstruction
Results
Portland, ME 04101

Construction of Bike Path Extension for Riverside Park
Results
Presque Isle, ME

Parking Lot Expansion at EMCC Rangeley Hall
Post-Bid
Bangor, ME 04401

2020 Tuttle Road Sidewalk Extension and Road Realignment
Results
Cumberland, ME 04021

Asphalt Sidewalk/Curb Replacement
Post-Bid
Auburn, ME

Evergreen Cemetery Admin Building ADA Accessibility Ramp Construction
Results
Less than $32,000 est. value
Portland, ME 04103

Paving Project
Post-Bid
Swanville, ME 04915

Trail 5 Sylvan Road Project
Results
Bangor, ME 04216

Sidewalk Construction Route 27 in the Municipalities of Boothbay and Boothbay Harbor
Post-Bid
$565,000 est. value
Boothbay, Boothbay Harbor, ME 04537

Wishcamper Parking Lot Project
Results
Portland, ME 04100

Windham Middle School SRRF Exterior ADA Access Upgrade
Post-Bid
Windham, ME 04062

Last Updated 06/16/2021 12:56 PM
Project Title

Howe Street Sidewalks

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04240   (Androscoggin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the Howe Street Sidewalks shall consist of, but not be limited to, the complete and satisfactory construction of the following: 1. Approximately 970 feet of granite curb and bituminous sidewalk along both sides of Howe Street between Birch and Walnut Streets. 75% of granite curb to be removed and reset and 25% new granite curb. 2. Miscellaneous utility adjustments, grading and drainage modifications, and reconstruction of accessible curb ramps at Birch Street.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents