Similar Projects
Elevate Navarre
New Construction
Conception
Navarre, FL 32566

Marie Estates
New Construction
Conception
Homestead, FL

Fifth Avenue Estates
New Construction
Design
Homestead, FL 33034

Old Naples Hotel
New Construction, Build-Out, Demolition - 6,230 SF
Design
Naples, FL

Routine and Emergency SVCS Pool of Prequalified Contractors
Infrastructure
Bidding
Miami Beach, FL

Cecil Complex - Pool Maintenance
Term Contract
Bidding
Jacksonville, FL 32221

AC Hotel by Marriott
New Construction - 71,700 SF
Post-Bid
$12,930,000 est. value
Jacksonville, FL 32246

Temple Terrace Family Recreation Complex Main Swimming Pool and Deck Refurbishment Project
Post-Bid
Temple Terrace, FL 33617

Dunns Creek State Park and Faver-Dykes State Park - Restroom Replacements
Results
Saint Augustine, FL 32086

Northwest Branch Library Restroom Renovation
Renovation - 450 SF
Results
Less than $96,680 est. value
Lake Mary, FL 32746

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

Water Pointe
New Construction - 1,277,564 SF
Construction
$7,140,000 est. value
Jupiter, FL 33477

Sand Mine Road Multi-Family
New Construction
Pending Verification
Davenport, FL 33837

West Shire Village
New Construction - 7,000 SF
Pending Verification
Ocala, FL

Lake Sana Development
New Construction
Conception
Westview, FL 33147

Reported 01/25/2022 01:22 PM
Project Title

Skyline Pool Facility

Physical Address View project details and contacts
City, State (County) Cape Coral, FL 33991   (Lee County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House, Swimming Pool(s)
Contracting Method Bids by Invitation.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value Less than $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Restroom/Bath House, 1 Story Above Grade, Approximately 1,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents