Similar Projects
Coastal Seafood
New Construction, Addition - 8,270 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Woolford, MD 21677

Seagirt Marine Terminal
Conception
$32,800,000 est. value
Baltimore, MD

Boardwalk Redecking Labor
Infrastructure
Bidding
Ocean City, MD

Construction/Installation of Floating Dock at Tuckahoe State Park
Infrastructure
Bidding
$100,000 to $500,000 est. value
Queen Anne, MD 21657

Main Deck Replacement at ELMS Environmental Educational Center
Post-Bid
Less than $49,999 est. value
Lexington Park, MD 20653

Request for Information (RFI) Impact Pile Driving
Post-Bid
Patuxent River, MD

Replacement at Inspiration Lake
Results
Gaithersburg, MD 20878

Pier 10 Landside Stabilization at North Locust Point Marine Terminal - SBR Only
Results
$1,000,000 to $2,500,000 est. value
Baltimore, MD 21202

Four Seasons at Kent Island Phase II
New Construction - 26,566 SF
Construction
Centreville, Chester, MD 21619

Living Shoreline, Erosion Control, Kayak Launch And Stone Bulkhead & Improvements
Renovation
Pending Verification
Arnold, MD

Bulkhead, Piers, Pilings, and Boat Lifts
Renovation
Pending Verification
Annapolis, MD 21403

Removal of Derelict or Abandoned Boats in Choptank Marina
Post-Bid
Denton, MD

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Bulkhead Replacement
Renovation
Pending Verification
Annapolis, MD

Construction of a Marina
Demolition, Infrastructure
Post-Bid
$250,000 to $300,000 est. value
Annapolis, MD 21403

Last Updated 06/28/2021 03:16 PM
Project Title

Removal and Replacement Existing Mill Flume

Physical Address View project details and contacts
City, State (County) Westminster, MD 21158   (Carroll County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the removal and replacement of the existing mill flume and associated wood and stone components. Including, the flow gates from the trash rack to the wheel, the apron, the bridge decking and supports. The repair and repointing of the stone support piers and failing stone wall veneer

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents