Similar Projects
High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

Design-Build Services I-70/Picadilly Interchange
Post-Bid
$37,000,000 to $43,000,000 est. value
Aurora, CO 80012

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Platteville Boulevard Turn Lanes
Results
Pueblo West, CO 81007

Citywide Bike - Bike Lane Package 1
Post-Bid
$1,070,000 to $1,300,000 est. value
Denver, CO

County Road 509 Siphon Replacement Project
Results
Durango, CO 81301

Concrete Replacement Program
Post-Bid
Thornton, CO

County Line Road Improvement Project
Results
Less than $2,000,000 est. value
Longmont, CO 80501

2C Extension Asphalt Overlay
Post-Bid
Colorado Springs, CO

CR 210 Paving Overlay Project
Results
Durango, CO 81301

2021 Citywide Chip Seal and Crack Seal
Post-Bid
$4,000,000 to $4,400,000 est. value
Denver, CO

Lakes Residential Phase 9 Public Infrastructure
Results
Less than $2,000,000 est. value
Loveland, CO 80537

Y--Zapata Road Improvements
Results
$1,500,000 to $2,500,000 est. value
Alamosa, CO 81101

San Juan National Forest, Pagosa Ranger District, Turkey Springs Road Resurfacing. This Solicitation Updates And Replaces Solicitation Number 1282CS20R0005
Results
Pagosa Springs, CO

San Juan National Forest, Forest Service Lone Dome Road (NFSR 504) Resurfacing.
Results
$1,000,000 to $5,000,000 est. value
Dolores, CO 813013647

Reported 04/01/2022 12:00 AM
Project Title

2022 Asphalt Maintenance Project

Physical Address View project details and contacts
City, State (County) Pagosa Springs, CO 81147   (Archuleta County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 02/28/22
Owner View project details and contacts
Architect View project details and contacts
Description

The base project involves typical asphalt maintenance methods on Archuleta County roadways including, and not limited to County Road 500, Meadows Drive, Piedra Road, South Pagosa Boulevard, North Pagosa Boulevard and Talisman Drive. The project includes removal of HMA, excavation, sub-grade preparation, sub-grade stabilization, HMA paving of full roadway widths, HMA full depth patching, milling and overlay, traffic control and other items typically associated with road construction. The Owner has a set budget with asphalt maintenance locations and quantities to be adjusted for priority roadways.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents