Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Water Filtration System
Renovation
Bidding
$600,000 CJ est. value
Woodburn, OR 97071

Fords Pond Community Park & Trail Improvements - Phase II
Infrastructure
Bidding
$500,000 CJ est. value
Sutherlin, OR 97479

Water Filtration Plant Clearwell Baffling System
Infrastructure
Sub-Bidding
$350,000 CJ est. value
Pendleton, OR 97801

Plumbing Contractor of Record
Infrastructure
Sub-Bidding
$130,000 CJ est. value
Salem, OR 97301

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Commercial Plumbing Service
Alteration
Results
OR

wastewater control system
Term Contract
Sub-Bidding
Albany, OR 97321

On-Call Trade Services for Prevailing Wage Projects
Term Contract
Post-Bid
OR

Tri-City Water Resource Recovery Facility ("WRRF") Fill Removal
Infrastructure
Results
$662,500 CJ est. value
Oregon City, OR 97045

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Philomath Water Treatment Plant Improvements, Phase I
Infrastructure
Results
$4,161,000 CJ est. value
Philomath, OR 97370

Plumbing Supplies - EOCI
Term Contract
Post-Bid
Umatilla, OR 97882

Last Updated 04/18/2023 03:05 AM
Project Title

Water System Improvements - Phase II - Collector Well No. 3 Pump Station, Booster Pump Station and 1 Million Gallon Reservoir

Physical Address View project details and contacts
City, State (County) Boardman, OR 97818   (Morrow County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $9,900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

the construction of Water System Improvements - Phase II - Collector Well No. 3 Pump Station, Booster Pump Station, and 1 Million Gallon Reservoir - 2023. The Work for this Contract consists of the construction of a booster pump station, a collector well pump station, and a 1 million gallon reservoir; installation of various piping and appurtenances varying in size up to 36-inch; together with all other Work required to complete the Project as shown on the Drawings and specified herein. Est. Value Notes: $9.4 million to $9.9 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work will be substantially completed within 400 days; final completion- 430 days.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents