Similar Projects
Casey`s General Store
Addition, Build-Out - 4,000 SF
Design
Saint Charles, IL 60174

Culver's / Batavia
New Construction - 4,500 SF
Design
$1,500,000 est. value
Batavia, IL 60510

Arby's #1413
Renovation
Post-Bid
Saint Charles, IL 60174

Beef Shack
Build-Out
Post-Bid
Valley View, IL 60174

Superior of Waterford Clubhouse
New Construction - 3,600 SF
Construction
$500,000 to $1,000,000 CJ est. value
Aurora, IL 60504

Burger King #2160
Renovation
Construction
Montgomery, IL 60538

The Hive Tavern and Eatery
Renovation
Pending Verification
Saint Charles, IL 60174

French Bakery
Build-Out
Pending Verification
Elgin, IL 60120

Cafeteria Expansions
Addition
Post-Bid
Elgin, IL 60124

Longhorn Steakhouse
New Construction - 6,644 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Algonquin, IL 60102

Gas N Wash
New Construction
Pending Verification
Montgomery, IL 60506

Papa John's
New Construction - 1,620 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value

Pizza Hut
Build-Out
Construction
Aurora, IL 60506

Sturdy Shelter Brewery
Build-Out - 1,200 SF
Pending Verification
Batavia, IL 60510

Starbucks
Renovation - 1,830 SF
Post-Bid
$400,000 est. value
Aurora, IL 60506

Last Updated 09/13/2022 04:04 PM
Project Title

Pinney Street Deck Replacement

Physical Address View project details and contacts
City, State (County) Aurora, IL 60506   (Kane County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Municipal Agency - 08/30/22
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of wood decking, stringers, landings, and stairs of an approximately 2600 SF wooden deck mounted to the restaurant buildings along the south side of Pinney Street. The City reserves the right to waive technicalities and reject any or all proposals as provided in Standard Provisions for Bidding Requirements and Conditions for Contract Proposals contained in the Supplemental Specifications and Recurring Special Provisions. 3. Any bidder who owes the City money may be disqualified at the City's discretion. 4. The City encourages minority business firms to submit proposals and encourages the successful contract bidder to utilize minority businesses as subcontractors for supplies, equipment, services, and construction. 5. Submission of a bid shall be conclusive assurance and warranty the bidder has examined the plans and understands all requirements for the performance of work. The bidder will be responsible for all errors in the proposal resulting from failure or neglect to conduct an in-depth examination. The City will, in no case be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the bidder. 6. The City of Aurora has a local preference ordinance that would apply to this contract.

Details

2,600 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents