Similar Projects
Concrete Pavement Repairs
Infrastructure
Conception
$9,900,000 est. value
Babylon, NY

Priority Resurfacing
Infrastructure
Design
$15,000,000 est. value
Huntington, NY 11743

Paving
Infrastructure
Bidding
$200,000 est. value
Shirley, NY 11967

Improvements to South Ferry Dock, NY Route 11
Infrastructure
Bidding
$1,500,000 est. value
Sag Harbor, NY 11963

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Wooden Walkways & Beach Dune Crossovers
Renovation, Alteration
Post-Bid
Fire Island, NY

Redevelop Neighborhood Road and Commack Road Area in Mastic Beach
Infrastructure
Results
Brookhaven, NY

Lakeside Drive Roadway and Slope Stabilization
Infrastructure
Results
Huntington, NY 11721

Beaver Dam Road Stormwater Management
Infrastructure
Bidding
$2,000,000 est. value
Brookhaven, NY 11719

Requirement Contract to Furnish and Install Asphalt Concrete on Town Roadways
Term Contract
Post-Bid
Lindenhurst, NY

Asphalt Repairs and Maintenance
Infrastructure
Results
Dix Hills, Farmingdale, Huntington, Kings Park, Northport, Smithtown, West Babylon, Wheatley Heights, NY 11746

Walnut Street Resurfacing
Infrastructure
Bidding
$52,408 est. value
Port Jefferson, NY 11777

Requirement Contract for Roadway Reconstruction
Term Contract
Post-Bid
Lindenhurst, NY

Surface Treatment
Infrastructure
Results
East Hampton, Southampton, NY

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Reported 06/28/2022 03:32 PM
Project Title

NY27 Med Bar 5th Ave to Brentwood

Physical Address View project details and contacts
City, State (County) Islip, NY 11751   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2027, Construction Completion Expected June 2028
Bids Due View project details and contacts
Estimated Value $8,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a road / highway in Islip, New York. Conceptual plans call for site work for a road / highway. This project proposes to install Median Barrier on NY27 in the Town of Islip between 5th Ave and Brentwood Rd, Town of Islip, Suffolk County. This Project is Located in the Capital District Region and Includes the Following: Counties Suffolk As of June 27, 2022,The current status of the project is Future Development. The Bid Opening is expected to be in Spring 2027. Construction is expected to begin in Spring 2027. Construction is expected to be completed in Spring 2028. NYSDOT - NY27 Med Bar 5th Ave to Brentwood *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents