Similar Projects
Renfrew Bridge
New Construction, Demolition, Infrastructure, Alteration
Conception
$2,303,000 est. value
Renfrew, PA 16053

I-79 Southern Section Reconstruction
Infrastructure
Conception
$185,900,000 CJ est. value
Jackson Township, PA 16063

Additions and Renovations to Chicora Elementary School
Addition, Demolition, Renovation, Infrastructure
Design
$16,971,000 CJ est. value
Chicora, PA 16025

Remove and Replace Existing Sidewalk
Infrastructure
Design
$200,000 CJ est. value
Mars, PA 16046

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Pump Station Improvements Project for Greenwood, Benbrook and Bryson Pump Stations
Post-Bid
Butler, PA

Pearce Road Grinder Pump Installation Project
Post-Bid
Mars, PA 16046

Municipal Park Waterline Extension Project
Infrastructure
Results
$40,000 to $55,000 est. value
Mars, PA

Peters Road Water Line Replacement
Infrastructure
Results
$500,000 est. value
Cranberry Township, PA 16066

West New Castle St Phase 3 - Borough of Zelienople
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Zelienople, PA 16063

Henley Lofts
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Adams Township, PA 16046

Three Degree Road Intersection
Infrastructure, Alteration
Design
$48,928,145 est. value
PA

Pump Station Improvements Project for Fisher, Brewster, and Brewster Booster Pump Stations
Post-Bid
Butler, PA

Sun Valley Utilities Upgrade
Infrastructure
Results
$800,000 est. value
Cranberry Township, PA 16066

Backflow Test / Inspect- Multiple Pennsylvania Locations
Term Contract
Post-Bid
Brookville, Butler, Clearfield, Coraopolis, Cranberry Township, Greensburg, New Kensington, Punxsutawney, Saint Marys, Washington, PA 15825

Last Updated 07/28/2022 10:05 AM
Project Title

Cobblestone Pump Station Interceptor Project

Physical Address View project details and contacts
City, State (County) Mars, PA 16046   (Butler County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $135,550 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The BREAKNECK CREEK REGIONAL AUTHORITY will receive sealed Bids for a project entitled COBBLESTONE PUMP STATION INTERCEPTOR PROJECT. The work involves the installation of approximately 200 LF of sanitary sewer, manholes and the demolition and removal of a pump station; as well as any incidental miscellaneous work generally related to sewer construction. Each Bid shall be accompanied by a Certified Bank Check or Bid Bond, in the required form as stated in the Project Manual, in an amount not less than five percent (5%) of the Bid Total. The Authority reserves the right, at its option, to waive any informalities, defects, errors or omissions in any or all Bids and to reject any or all Bids. Bidder's inquiries relative to this Project should be directed to the Engineer whose address is stated herein. The contact person at the Engineer's office is: DanielJ. Goncz, P.E. Phone No. (412)503-4526

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents