Similar Projects
Scott Street Attainable Housing
New Construction
Conception
Missoula, MT 59802

Samaritan House Expansion
New Construction, Addition
Conception
Kalispell, MT 59901

Cedar Meadows
New Construction
Design
Libby, MT 59923

Meadow Lake Boulevard Apartments
New Construction
Design
Columbia Falls, MT 59912

Blackfeet Reservation Apartment Complex, Browning MT
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Browning, MT 59417

9Ten Apartments - TIF
Renovation
Post-Bid
Bozeman, MT 59715

Executive Residence Renovations - Phase 2
Renovation
Results
Helena, MT 59601

MT Personal Warehouse 1
New Construction - 1,250 SF
Pending Verification
Kalispell, MT

Creekside Commons
New Construction, Infrastructure
Pending Verification
$13,579,200 CJ est. value
Kalispell, MT 59901

Spring Creek Park Subdivision
New Construction
Conception
Kalispell, MT 59901

Park Meadows Apartments
New Construction - 568,181 SF
Design
$10,000,000 CJ est. value
Bozeman, MT 59718

General Contract Chippewa Cree Housing Authority
New Construction, Infrastructure
Post-Bid
$174,000 CJ est. value
Box Elder, MT 59521

Parkland Meadows Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Kalispell, MT 59901

Transitional Housing Facility
Renovation
Conception
$1,400,000 est. value
Missoula, MT 59802

Fairbridge Inns
Renovation
Design
Kalispell, MT 59901

Last Updated 10/07/2022 04:07 PM
Project Title

Otis Apartments

Physical Address View project details and contacts
City, State (County) Missoula, MT 59802   (Missoula County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 7, 2022, this is in the design phase. An architect has been selected. The developer has been disclosed. Although a firm timeline cannot currently be established, construction is not expected to commence prior to first quarter 2023.

Details

46,800 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents