Similar Projects
Chemical Metering Pump Upgrades at the Shaft-10 Pump Station Facility
Infrastructure
Bidding
Tarrytown, NY

Submersible Pumps
Post-Bid
White Plains, NY 10601

Dewatering Pumps
Post-Bid
Valhalla, NY 10595

Complete Turnkey Rebuilding of an Existing Sulzer/Johnston Vertical Turbine Pump
Results
Millwood, NY 10546

Submersible Well Pump
Results
White Plains, NY 10601

Provide Servicing and Repair of Water Pumps at Various PRC Facilities
Post-Bid
Croton-on-Hudson, Mount Vernon, New Rochelle, Rye, Tuckahoe, White Plains, Yonkers, Yorktown Heights, NY 10805

Replacement of Duplex Sump Pumps at School 23
Results
Yonkers, NY 10701

NRHS Pump Replacement
Term Contract
Post-Bid
New Rochelle, NY 10801

Pump Rebuild
Results
White Plains, NY 10601

Sump Pumps
Results
White Plains, NY 10601

Sewage Pump
Results
White Plains, NY 10601

Water Pump and Motor Maintenance and Repair
Term Contract
Results
Yonkers, NY 10703

Pump System Repairs
Results
White Plains, NY

Well Pumps
Results
Tuckahoe, NY

Pump
Results
Valhalla, NY

Last Updated 11/15/2021 04:02 PM
Project Title

Water Pumps and Motors Maintenance and Repair

Physical Address View project details and contacts
City, State (County) Yonkers, NY   (Westchester County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Service Work and/or Materials for the maintenance and repair of its water pumps and motors in service at various locations within the City. The resulting contract shall be for a period of 24 months with an option to renew for an additional 12 months. Semiannual Maintenance : Check stuffing box glands for free movement; Clean and oil gland bolts; Inspect packing to determine whether it requires replacement; Pump and driver alignment are to be checked and corrected if necessary; Oil lubricated bearings are to be drained and refilled with fresh oil; Grease lubricated bearings are to be checked for grease content and of suitable consistency.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents