Similar Projects
Evolve Biologics Manufacturing Facility
New Construction
Conception

Mcgee Street Bridge - Erosion and Overlay Repairs - City of Sherman
Infrastructure
Conception
$900,000 CJ est. value
Sherman, TX 75092

Freedom Jeep Showroom Addition / Sherman
Addition, Demolition, Infrastructure - 9,629 SF
Design
$2,500,000 CJ est. value
Sherman, TX 75092

Hickory Hill Residential
New Construction, Infrastructure
Design
$95,000,000 CJ est. value
Sherman, TX 75092

Water Meter Supply Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Bells, TX 75414

SH 56 - Construct Pedestrian Infrastructure
Infrastructure
Bidding
$604,114 CJ est. value
Sherman, TX 75092

Parking Lot Repairs
Infrastructure
Post-Bid
Sherman, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Hilre Drive Extension
Results
$440,000 est. value
Sherman, TX

Marshall Drive Paving and Utilities
Results
Van Alstyne, TX

Hampton Inn & Suites Sherman
New Construction, Infrastructure - 49,260 SF
Pending Verification
$6,000,000 CJ est. value
Sherman, TX 75092

QuikTrip #1915
New Construction, Infrastructure - 5,312 SF
Pending Verification
$725,000 CJ est. value
Sherman, TX 75090

Lamberth Road Expansion - Shady Oaks To Friendship Road - City of Sherman
Infrastructure
Conception
$4,600,000 CJ est. value
Sherman, TX 75090

First State Bank Whitesboro
New Construction, Infrastructure - 14,999 SF
Design
$2,500,000 CJ est. value
Whitesboro, TX 76273

O'Reilly Auto Parts / Sherman
New Construction, Infrastructure - 7,225 SF
Bidding
$1,000,000 CJ est. value
Sherman, TX 75092

Last Updated 09/26/2022 09:32 AM
Project Title

Midway Industrial Park Addition / Lot 4

Physical Address View project details and contacts
City, State (County) Sherman, TX 75090   (Grayson County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $260,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 26, 2022, this project has not submitted any building applications with the City of Sherman. Information regarding a general contractor has not been disclosed. A firm construction timeline has yet to be established. Project Address: 5100 & 5104 Marshall Street *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents