Similar Projects
Athens Street Improvements - City of Gainesville
Infrastructure, Alteration
Conception
$250,000 est. value
Gainesville, GA 30501

Mulberry Street Residential Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Flowery Branch, GA 30542

Sanitary Sewer Ream and Reline (8" DIP)
Infrastructure
Design
$200,000 CJ est. value
Flowery Branch, GA 30542

Sanitary Sewer Ream and Reline (8" DIP)
Infrastructure
Design
$200,000 CJ est. value
Flowery Branch, GA 30542

Milling, Inlay, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 60
Infrastructure
Bidding
$2,000,000 CJ est. value
Gainesville, GA 30501

FY 2023 Water Main Improvements Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Gainesville, GA 30501

AutoZone #0914 / Gainesville
New Construction, Infrastructure - 7,000 SF
Post-Bid
$1,500,000 CJ est. value
Gainesville, GA 30501

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Large Water Meter Replacement
Results
Flowery Branch, GA

Wauka Mountain Elementary School - Site Improvements
Results
Gainesville, GA 30506

Gainesville Midland Apartments
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Gainesville, GA 30501

Agile Cold Storage Freezer Distribution Hub
New Construction, Infrastructure - 150,000 SF
Pending Verification
$20,000,000 CJ est. value
Gainesville, GA 30507

Moss Farm
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Lula, GA 30554

Mitchell Street Improvements - City of Flowery Branch
Infrastructure
Conception
$851,126 CJ est. value
Flowery Branch, GA 30542

SR 53 Fm CS 656 / Cedar Ridge Dr to S of SR 211 / Tanner Mill Rd
Infrastructure
Design
$2,000,000 CJ est. value
Gainesville, GA 30501

Last Updated 11/17/2022 05:34 AM
Project Title

Union Church Road Gravity Sewer - Hall County

Physical Address View project details and contacts
City, State (County) Flowery Branch, GA 30542   (Hall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Run sewer from Union Circle Pump Station up Union Church Road to serve many large parcels along this corridor. As of November 17, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents