Similar Projects
Corner Repair FY22-23 - Citywide ADA
Infrastructure
Bidding
$200,000 est. value
Kansas City, MO

Concrete and Brick Removal / Replacement and Complete Sidewalk Installation
Infrastructure, Alteration
Bidding
$687,130 est. value
Saint Louis, MO

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

2021 Sidewalk Replacements
Post-Bid
Saint Joseph, MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

2022 Curb Project
Infrastructure
Bidding
$120,000 est. value
Raymore, MO

Seal and Restripe the Asphalt Parking Lots
Infrastructure
Post-Bid
Lathrop, MO

Sidewalk Brick Band Replacement
Results
Kirksville, MO

Chicken N Pickle
New Construction, Term Contract - 32,923 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint Charles, MO

SLBE Vernon Court Sidewalks (West Side)
Infrastructure
Bidding
$300,000 est. value
Raytown, MO 64133

Parking Lot Resurfacing Project
Infrastructure
Post-Bid
Potosi, MO

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

Last Updated 06/27/2022 07:22 AM
Project Title

Driveway / Parking Lot / Sidewalk - Concrete Work

Physical Address View project details and contacts
City, State (County) Wardsville, MO   (Cole County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include concrete paving (approximately 31,000 sq ft) and improvements to the driveway of the high school. Also included are other concrete paving projects throughout the District.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents