Similar Projects
71st Drive Drainage Ditch Improvements
Infrastructure
Bidding
Live Oak, FL 32060

Lake Lancaster to Lake Davis Drainage Improvement
Infrastructure
Bidding
$915,000 est. value
Orlando, FL 32806

Drainage Improvements Gladeview Area Phase I-A and Phase II
Post-Bid
Less than $1,140,058 est. value
Miami, FL 33128

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Shingle Creek Shoal Removal
Results
Kissimmee, FL 34741

Shore Protection Project, Anna Maria Island, Beach Renourishment 2020, Manatee County, Florida
Results
$15,000,000 to $25,000,000 est. value
Anna Maria, FL

Resurfacing/Base Work/Drainage Improvements
Infrastructure
Bidding
$22,403,936 est. value
FL

Underdrains Installation and Repairs
Post-Bid
Less than $6,771,550 est. value
FL

Erosion Control/Stormwater Repair at Clay High School
Results
Less than $165,969 est. value
Green Cove Springs, FL

Coronado Drive and Godfrey Avenue Drainage Improvement
Infrastructure
Bidding
$250,000 to $500,000 est. value
Spring Hill, FL 34609

Central Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir Project
Post-Bid
$100,000,000 to $250,000,000 est. value
Palm Beach, FL

Design/Build H Matthew Waterfront Repair, STA Ponce De Leon Inlet, USCG Station New Smyrna Beach, FL
Results
$1,000,000 to $2,000,000 est. value
New Smyrna Beach, FL

Spring Lake Estates Drainage Improvements (Phase 1)
Infrastructure
Bidding
Callahan, FL 32011

Design Build Step 1-Immokalee Area Improvements - Tiger Grant
Post-Bid
$16,400,000 est. value
Immokalee, FL 34142

Coastal Storm Risk Management Project, South Ponte Vedra and Vilano Beach, St. Johns County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

Last Updated 01/25/2022 01:32 AM
Project Title

Remove and Replace Two Concrete Cross-Drain Pipes

Physical Address View project details and contacts
City, State (County) FL   (Taylor County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and Replacement of Two Concrete Cross-drain Pipes Under Unpaved Roadway as Shown in Plans. Concrete Drainage Pipes, Mitered End Sections, Maintenance of Traffic and the Removal and Replacing of Fence Shall Be Provided by the Department. Sodding of Headwall, Backfill Materials, Labor, Tools, Equipment, and All Other Incidentals Shall Be Provided by the Contractor at Two Specified Locations on Arthur Padgett Road Section 0001 Repair/replace Strm-side-cross Drain(Lf) E999- 10- 41 Maintenance Lump Sum Contract Ls 1.000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents