Similar Projects
D/B - GSA LPOE Pacific Highway, WA. Lane Expansion Project
Infrastructure
Design
$20,000,000 est. value
Blaine, WA 98230

Park Street Turn Lanes
Infrastructure
Bidding
$50,000 est. value
North Bend, WA 98045

Town Center - Utility and Woonerf Project
Infrastructure
Bidding
$5,000,000 to $6,100,000 est. value
Sumner, WA

SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Infrastructure
Post-Bid
$20,000,000 est. value
WA

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Improvement of Middle Waitsburg Road MP 6.10 To MP 7.92
Infrastructure
Results
Walla Walla, WA 99362

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

SR 161 / Washington Avenue North Corridor Streetscape Phase 2
Infrastructure
Bidding
$2,300,000 to $2,500,000 est. value
Eatonville, WA 98328

Asphalt Crushing Services
Infrastructure
Post-Bid
Longview, WA

Johnson Area Roads Overlay
Infrastructure
Results
$487,238 est. value
Aberdeen, WA 99111

2022 Pavement Repair Project
Infrastructure
Bidding
$235,000 to $305,000 est. value
Mukilteo, WA

Metzger Road Project CRP
Infrastructure
Post-Bid
Carson, WA 98610

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

Wedge Neighborhood Area Overlay Project
Infrastructure
Bidding
$700,000 est. value
Woodinville, WA

Improvements E Agate Road Resurfacing
Infrastructure
Post-Bid
$400,000 to $500,000 est. value
Shelton, WA

Reported 05/13/2022 12:00 AM
Project Title

Relocate Runway Connector and Construct West Taxilane

Physical Address View project details and contacts
City, State (County) Brewster, WA   (Okanogan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $436,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to, the demolition and relocation of the existing runway connector and the construction of the west taxilane, which will include clearing and grubbing, excavation, subgrade preparation, drainage, placement of base materials, asphalt paving, relocation of runway hold position sign, electrical work on existing runway edge light circuit, and marking new pavements.

Details

Division 00 - Procurement and Contracting Requirements, Available Project Information, Geotechnical Data, Exploratory Excavation Information.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 26 - Electrical, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents