Similar Projects
RR-21-4827 Tri-State Tollway (I-294) Pavement Rehabilitation
Infrastructure
Bidding
IL

2021 Patrol 1 Maintenance
Post-Bid
Libertyville, IL

Class B Patching, Class D Patching, Crack Filling of a Concrete Roadway, Striping Replacement, Curb and GutterRemoval and Replacement
Post-Bid
IL 60089

Storm Sewer Removal and Installation, Storm Sewer Installation By Directional Boring, Culvert Removal, Patching, Placement of HMA Surface Course, Earthwork, Dewatering, and Other Related Items
Results
Libertyville, IL 60048

Storm Sewer Removal and Installation, Storm Sewer Installation By Directional Boring, Culvert Removal, Patching, Placement of HMA Surface Course, Earthwork, Dewatering, and Other Related Items
Results
Libertyville, IL 60048

Central HS Parking Lot Improvements North HS Courtyard Improvements
Post-Bid
Grayslake, IL 60030

Construction of a Shared-Use Path from the Raven Glen Forest Preserve to the Ethel's Woods Forest Preserve, and Construction of a US 45 Pedestrian Underpass in Antioch
Results
IL

2021 Landscape Services
Post-Bid
Highland Park, IL

(6.452 Mile) Standard Overlay and New HMA Shoulders on Il 60/83 from Il 120 (Belvidere Rd) to Il 176. Located within the Villages of Volo, Ivanhoe, Round Lake Park
Results
Hainesville, Ivanhoe, Round Lake Park, Volo, IL 60073

2021 Curb and Sidewalk Program
Post-Bid
Grayslake, IL

Skokie Sewer Improvements
Results
Gurnee, IL 60031

2021 Crestfield Subdivision Resurfacing
Post-Bid
Indian Creek, IL

Hunt Club Park Sidewalk Rehabilitation
Renovation
Results
Gurnee, IL 60031

2021 Sanitary Sewer Spot Repair
Post-Bid
Libertyville, IL

2020 Knox Park Parking Lot Maintenance
Results
Lake Zurich, IL 60047

Last Updated 12/10/2021 12:32 PM
Project Title

2022 Forest/Glendale Street & Utility Improvements

Physical Address View project details and contacts
City, State (County) Buffalo Grove, IL 60089   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,708,976
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Preparation of base; water main replacement and related appurtenances; water service lines; storm sewer improvements and spot repairs; sanitary sewer spot repairs and related appurtenances; sanitary sewer service lines; curb and gutter, and sidewalk removal and replacement at various locations; pavement patching; hot-mix asphalt binder and surface course(s); parkway restoration; and other appurtenant work for a total distance of 2.2 miles on Forest Place, Glendale Road, St. Mary's Parkway, Navajo Trail, Crestview Terrace, Brucewood Drive, Frances Court, Bernard Drive, and Buffalo Grove Road in the Village of Buffalo Grove.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents