Similar Projects
Lumberyard Affordable Housing Development
New Construction, Infrastructure
Design
$330,000,000 CJ est. value
Aspen, CO 81611

2022 Asphalt Overlay Project
Infrastructure
Design
$500,000 CJ est. value
Aspen, CO 81611

RFP Engineering - Castle Creek Bridge Underpass Retaining Wall Assessment and Design
Infrastructure
Bidding
$60,000 CJ est. value
Aspen, CO 81611

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Countywide Chip Seal Project
Results
Aspen, CO 81611

Snowmass Water and Sanitation District Edgewood Water Line Connection
Infrastructure
Construction
$200,000 CJ est. value
Snowmass Village, CO 81615

New Terminal - Aspen-Pitkin County Airport
Addition, Infrastructure
Pending Verification
$121,800,000 CJ est. value
Aspen, CO 81611

New Terminal - Aspen-Pitkin County Airport
Addition, Infrastructure
Pending Verification
$121,800,000 CJ est. value
Aspen, CO 81611

Snowmass Center Redevelopment
Demolition, Renovation, Infrastructure - 170,101 SF
Design
$5,000,000 CJ est. value
Snowmass Village, CO 81615

Multimodal Improvements Project
Alteration
Post-Bid
Snowmass Village, CO 81611

Co Flap Pit 82(1) Brush Creek Parking Area
Results
$4,500,000 to $6,500,000 est. value
CO 81611

Aspen Valley Hospital Phase 4
New Construction, Renovation, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Aspen, CO 81611

2022 Countywide Paving Project
Infrastructure
Post-Bid
CO

Last Updated 09/28/2022 10:54 AM
Project Title

2023 Asphalt Overlay Project

Physical Address View project details and contacts
City, State (County) Aspen, CO 81611   (Pitkin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Addendum: 2 As of 9/21/2022 there are two (2) Addenda available for this project. Asphalt street improvements to improve structural stability and provide increased longevity on up to 10 street segments. Full width roto-milling will remove 1.5-inches of asphalt thickness, sub-base repair work may be completed where necessary, and a new 2.0-inch asphalt mat will be placed to bring the street to grade. The street segments are included in the following table: STREET FROM:TO W. Bleeker St. N. 6th To N. 7th E. Hopkins St. S. Monarch St. To S. Mill St. E. Hyman Ave. S. West End St. To end of Hyman (900 and 1000 block of E. Hyman) E. Hyman Ave. S. Aspen St. To S. Monarch St (200 block of E. Hyman) N. Aspen St. E. Main St. To E. Bleeker St. N. Mill St. E. Main St. To Rio Grande Pl. N. Mill St. Rio Grande Pl. To the speed hump past Gibson Ave. S. Aspen St. E. Main St. To E. Durant Ave. S. Monarch St. E. Hyman St. To E. Durant Ave. Ute Ave. S. Original St. To End of Ajax Park Bonding Requirements - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % Job Location Aspen Colorado Question Acceptance Deadline 09/17/2022 01:59 AM EDT Questions are submitted online Yes

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents