Similar Projects
Syringa Park Phase 2 - City of Missoula
Infrastructure
Conception
$336,000 CJ est. value
Missoula, MT 59802

Animal Control Lead Architectural Services
Addition, LEED Certification, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Missoula, MT 59808

Historical Museum at Fort Missoula Alien Detention Center Barracks
New Construction, Renovation, Infrastructure
Design
$691,100 CJ est. value
Missoula, MT 59804

George Elmer Drive/Cattle Drive Roundabout Project
Infrastructure
Design
$400,000 CJ est. value
Missoula, MT 59808

Clark Fork 5 M E Alberton
Infrastructure
Bidding
$4,000,000 CJ est. value
Missoula, MT 59808

Clark Fork 5 M E Alberton
Infrastructure
Bidding
$4,000,000 CJ est. value
Missoula, MT 59808

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Montana Museum of Arts Culture Building Site Work Project
Infrastructure
Post-Bid
Missoula, MT 59812

Hudson Bay Divide South
Infrastructure
Results

Cooper Street Alley Water Main Replacement Project
Infrastructure
Results
Missoula, MT

Improvements to Existing Intercollegiate Student-Athletic Support Areas-Washington-Grizzly Stadium and the Adams Center
Infrastructure
Conception
$1,800,000 CJ est. value
Missoula, MT 59812

Equipment Storage Building
New Construction, Infrastructure - 4,000 SF
Bidding
$100,000 CJ est. value
Seeley Lake, MT 59868

Rehabilitate Eight Bridges in District 1 between RP 117.07 and RP 148.03 on Interstate 90 (I-90) in Missoula and Granite County. Eight of the bridges carry I-90 and one is an overpass over I-90
New Construction, Infrastructure
Post-Bid

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Mullan Build Grant - City of Missoula
Infrastructure
Conception
$30,000,000 CJ est. value
Missoula, MT 59808

Last Updated 08/04/2022 11:33 AM
Project Title

South Avenue Improvements (Reserve to 36th) - S-19 - City of Missoula

Physical Address View project details and contacts
City, State (County) Missoula, MT 59804   (Missoula County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City annexed the South Avenue right-of-way in 2016 and plans to make physical improvements to the roadway in the form of curb, gutter, sidewalk, bike lane, asphalt trail, pavement, and storm drains. These improvements would implement the City's complete streets policy and allow for all modes of travel on this section of South Avenue. The anticipated roadway improvements will start at Reserve Street and continue west until reaching the intersection of 36th Avenue. This section is approximately 1.4 miles in length and currently consists of two lanes of asphalt with some sections of asphalt trail on the south side of the roadway. Improvements would allow pedestrians, bicyclists, motor vehicle operators to use the corridor to access Fort Missoula Regional Park, Big Sky High School, veteran cemetery, Community Medical Center along with other residences and businesses in the area. In addition, a new bridge over the Bitterroot River is planned at the end of South Avenue that will make this section of South Avenue an important collector street for the Missoula community. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of August 4, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents