Similar Projects
Watershed Pointe / Divide Highway
New Construction, Infrastructure
Conception
$11,700,000 CJ est. value
Little Rock, AR 72212

New District Courts Facility - 2022 Bond - City of Little Rock
New Construction
Conception
$8,500,000 CJ est. value
Little Rock, AR 72201

Interstate Battery / Sherwood
Addition, Infrastructure - 3,596 SF
Design
$900,000 CJ est. value
Sherwood, AR 72120

Interstate Battery / Sherwood
Addition, Infrastructure - 3,596 SF
Design
$900,000 CJ est. value
Sherwood, AR 72120

Construction of Delta Heritage Trail Phase VII
Infrastructure
Post-Bid
$400,000 est. value
AR

Convert Mission Planning Cell B-380
Addition, Demolition, Build-out, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
LrAFB, AR 72099

Annual Asphalt and Concrete Surface Repair Contract 2022
Term Contract, Infrastructure
Results
AR

2" Galvanized Water Main Replacements
Infrastructure
Results
$2,000,000 est. value
North Little Rock, AR

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

River City Hydraulics - Lantrip Road
New Construction, Infrastructure - 8,750 SF
Pending Verification
$2,300,000 CJ est. value
Sherwood, AR 72120

River City Hydraulics - Lantrip Road
New Construction, Infrastructure - 8,750 SF
Pending Verification
$2,300,000 CJ est. value
Sherwood, AR 72120

The Lofts at Kanis Creek
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Little Rock, AR 72223

Bowman Road Widening - City of Little Rock
Infrastructure
Design
$4,000,000 CJ est. value
Little Rock, AR 72211

Wellington Hills Apartments
New Construction, Infrastructure - 56,482 SF
Post-Bid
$85,000,000 CJ est. value
Little Rock, AR 72201

Last Updated 09/19/2023 09:07 AM
Project Title

49th Street Phase 2 (Division Street to Parker Street) Sewer and Drainage Improvements

Physical Address View project details and contacts
City, State (County) North Little Rock, AR 72118   (Pulaski County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $470,487 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

49th STREET PHASE 2 (DIVISION STREET TO PARKER STREET) SEWER AND DRAINAGE IMPROVEMENTS The project includes, but is not limited to, two blocks of residential street reconstruction in the City of North Little Rock, including earthwork, paving, curb and gutter, storm sewer, and sidewalk, as shown on the plans and indicated in the specifications. Proposals shall be accompanied by a cashier s or certified check upon a national or state bank in an amount not less than five percent (5%) of the total maximum bid price payable without recourse to the Owner, or a bid bond in the same amount from a reliable surety company, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds within ten (10) days after notice of award of Contract to him. Such bid guarantee shall be made payable to CITY OF NORTH LITTLE ROCK. The SUCCESSFUL bidder will be required to furnish a performance and payment bond upon the form provided in the amount of one hundred per cent (100%) of the contract price from an approved surety company holding a permit from the State of Arkansas to act as surety, or other surety or sureties acceptable to the Owner. All bidders shall comply with the requirements of the Contractor s Licensing Law of the State of Arkansas, and all applicable Arkansas regulations. All bonds on this project shall comply with Arkansas Statutory Performance and Payment Bond Law, Act 351 of 1953, as amended by Act 209 of 1957. Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. The City of North Little Rock encourages participation from MBE/DBE/WBE and SBA vendors. Bids must remain in effect for 60 days after the bid opening date. The City of North Little Rock reserves the right to reject any or all bids, to waive irregularities in the bids and bidding deemed to be in the best interests of the City of North Little Rock, and to reject nonconforming, nonresponsive, or conditional bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents