Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Library Addition - Elk Rapids District Library
Addition, Infrastructure - 6,320 SF
Design
$1,800,000 CJ est. value
Elk Rapids, MI 49629

Lakeland Elementary School Improvements - Bond 2020 - Elk Rapids Public School
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Elk Rapids, MI 49629

Barnes Park Expansion
Infrastructure
Post-Bid
$400,000 CJ est. value
Eastport, MI 49627

Barnes Park Expansion
Infrastructure
Post-Bid
$400,000 CJ est. value
Eastport, MI 49627

US 31 Elk River Bridge Repairs
Infrastructure
Post-Bid
$700,000 CJ est. value
Kewadin, MI 49648

US 31 Elk River Bridge Repairs
Infrastructure
Post-Bid
$700,000 CJ est. value
Kewadin, MI 49648

RFP - Bridge Street Housing Project
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Elk Rapids, MI 49629

Middle School - 2022 Bond - Mancelona Public Schools
Infrastructure, Renovation
Pending Verification
$5,000,000 CJ est. value
Mancelona, MI 49659

High School - 2022 Bond - Mancelona Public Schools
Infrastructure, Renovation
Pending Verification
$2,000,000 CJ est. value
Mancelona, MI 49659

Athletics - 2022 Bond - Mancelona Public Schools
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Mancelona, MI 49659

Orchard Hill Tower Replacement
Infrastructure
Results
$260,970 CJ est. value
Bellaire, MI 49615

Grass River Natural Area Access Improvements
Infrastructure
Results
$410,619 CJ est. value
Bellaire, MI 49615

Grass River Natural Area Access Improvements
Infrastructure
Results
$410,619 CJ est. value
Bellaire, MI 49615

Last Updated 08/21/2023 02:13 PM
Project Title

Torch Lake Superfund Site - Culvert and Roadway Reconstruction

Physical Address View project details and contacts
City, State (County) Torch Lake, MI 49648   (Antrim County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $138,688 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The construction activities will include, but are not limited to, installation of proper SESC measures required by the State and Local Agencies. Dredging of the stream bed prior to the installation of a 64-foot, 60-inch culvert. Following installation of the new culvert the washed-out area will need to be backfilled, with the appropriate fill material (followed by dredged/excavated material), to bring the area back up to the grade of the existing road. Once the area has been backfilled to the grade of the existing road, a 6-inch aggregate surface (such as 23AA) will be installed. To complete the proposed culvert and roadway reconstruction, riprap and 6-inch loam soil and vegetative cover (turf) will be installed on both sides of the roadway. If a vegetative cover does not establish, the contractor will be required to reseed during the spring. Question Deadline 08/04/2023 at 10:00 AM ET

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents