Similar Projects
LiDestri Conveyor Bridge System & Tank Farm Expansion
New Construction
Design
Rochester, NY 14606

Hundredmark Road Bridge Over Drainage Ditch
New Construction
Bidding
Elba, NY

Keuka Lake Waterfront Access Improvements - Pedestrian Bridge and Boardwalk
Post-Bid
Hammondsport, NY 14840

Rehabilitation of Mud Mills Road Bridge Over Ganargua Creek
Post-Bid
Newark, NY

Bridge Replacement of Rte 367 Truss Bridge Over Bentley Creek
Results
Less than $4,000,000 est. value
Wellsburg, NY 14894

Bridge Replacement of NY 248 Over Bennetts Creek and Culvert Replacement Near Van Sickle Road
Results
Less than $1,900,000 est. value
NY

Replacement of 3 Bridges- Meadville, Sharrick and Tower Hill Road
Term Contract
Post-Bid
NY

Charles Carroll Plaza Revitalization Project - Phase One
Results
Less than $4,915,372 est. value
Rochester, NY 14614

Panelized Bridge Material (2021-2022)
Term Contract
Post-Bid
NY

Bridge Replacement Project: I-86 over Tributary to Cohocton River
Results
Less than $2,000,000 est. value
Bath, NY 14810

Replacement of Canisteo Street Bridge over Crosby Creek
New Construction
Post-Bid
Hornell, NY 14843

2020 Bridge Preventative Maintenance
Results
Canandaigua, NY 14424

Transit Road Bridge Replacement over West Branch of Sandy Creek
New Construction
Post-Bid
Albion, Holley, NY

Replacement of Ridge Road Bridge over Salmon Creek
Results
Sodus, NY 14551

2020-2021 Panelized Bridge Material
Term Contract
Results
Elmira, NY 14901

Last Updated 04/23/2021 08:22 AM
Project Title

Low Bridge Clearance and Wrong Way Driver Countermeasures

Physical Address View project details and contacts
City, State (County) (Allegany, Chemung, Genesee, Livingston, Monroe, Ontario, Orleans, Steuben, Wayne Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will ensure all bridges on state highways with vertical clearances less than 14ft Regionwide. Low clearance bridges are considered structures with a minimum vertical clearance under 14 feet. These structures are struck due to a variety of reasons, including lack of driver cognizance with facility, non-commercial GPS usage and distractions from personal electronic devices. This project also includes a systemic implementation of new minimum standards for signing and pavement markings to discourage wrong-way entry through increased conspicuity at exit ramp termini statewide.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents