Similar Projects
Westwinds Park (Phase 3) - Lincoln County
New Construction
Conception
$883,000 est. value
Lincolnton, NC

Beatty's Ford Park Play Beach Additions - Lincoln County
New Construction, Infrastructure
Conception
Less than $360,000 est. value
Denver, NC 28037

Huber Technology Inc. / Lincoln County Office
New Construction, Infrastructure - 122,000 SF
Design
$39,500,000 CJ est. value
Denver, NC 28037

Creek Park & Little Egypt Subdivision
New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Denver, NC 28037

Rescue Squad Park Synthetic Turf
Infrastructure - 81,000 SF
Bidding
$1,000,000 CJ est. value
Denver, NC 28037

Rescue Squad Park Synthetic Turf
Infrastructure - 81,000 SF
Bidding
$1,000,000 CJ est. value
Denver, NC 28037

Westwinds Park Playground Equipment
Renovation
Post-Bid
Lincolnton, NC 28092

Field Turf and Track Resurfacing
Renovation
Post-Bid
$1,250,000 est. value
Lincolnton, NC 28092

Downton Parking Lot Project
Infrastructure
Results
$200,000 est. value
Lincolnton, NC 28092

Sunbelt Rentals Office and Showroom
New Construction, Infrastructure - 4,500 SF
Pending Verification
$1,000,000 CJ est. value
Denver, NC 28037

RFQ Construction Manager at Risk - Jail Expansion
Addition, Demolition, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Lincolnton, NC 28092

RFQ Construction Manager at Risk - Jail Expansion CMR
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
Lincolnton, NC 28092

Three Synthetic Turf Football Fields
Infrastructure
Post-Bid
$300,000 CJ est. value
Lincolnton, NC 28092

Take 5 Oil Change / Lincolnton
New Construction, Infrastructure - 1,489 SF
Post-Bid
$1,000,000 CJ est. value
Lincolnton, NC 28092

Airport Hangar Site Preparation
Infrastructure
Post-Bid
$3,200,000 CJ est. value
Iron Station, NC 28080

Last Updated 12/07/2022 07:41 AM
Project Title

Highland Drive Park Playground Equipment and Surfacing Project

Physical Address View project details and contacts
City, State (County) Lincolnton, NC 28092   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $139,535 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Development Improvements: a) Contractor to provide product costs and installation the following Playground equipment based on the project plans: PlayWorld - Product #: 350-2258 Challengers Playground Equipment (Total -1) PlayWorld - Product #: ZZXX0828 Heavy Duty 8' Swing Set (Total - 1) PlayWorld - Product #: ZZXX0829 Heavy Duty 8' Swing Extensions (Total - 1) PlayWorld - Product #: ZZXX0830 Heavy Duty 10' Swing Set (Total Items - 1) PlayWorld - Product #: ZZXX0831 Heavy Duty 10' Swing Extensions (Total - 2) PlayWorld - Product #: ZZXX-0265 Infant Swing for 8' Swing Set (Total -2) PlayWorld - Product #: ZZXX0635 Sing Along Seat for 8' Swing Set (Total - 2) Play World - Product #: ZZXX-0261 Black Belt Swing Seat for 10' Swing Set (Total - 6) Playground Equipment installation as listed above and as found in project plan set to follow all manufacturer's guidelines and specifications along with all CPSC, ASTM, ADA and any additional State Guidelines and Regulations for playground installation and safety. b) Contractor to provide product and installation costs of playground surfaces as on alternate bid amounts for the following surface types: 1) XGrass(R) Synthetic Turf for Play Areas or Equal 2) NoFault(R) Loose Rubber Mulch for Playgrounds (Terra Cotta) or Equal 3) NoFault(R) Safety Surface Poured-In Place Rubber Mat for 10' Fall Height or Equal Chosen Playground Surface installation from list above and as found in project plan set to follow all manufacturer's guidelines and specifications along with all CPSC, ASTM, ADA and any additional State Guidelines and Regulations for playground installation and safety for a 10' Fall Height. c) Contactor to disassemble, remove and replace existing playground equipment structure to another location as determined by the City of Lincolnton Parks & Recreation Department. d) Contractor to follow all the Project General Notes, Notes listed on individual plan sheets and construction details in the overall demolition, construction, and maintenance of the project components until final acceptance by the City of Lincolnton. e) Provide all labor, equipment, and materials described above and attached plans and specifications for a turn-key construction project of the Highland Drive Park - Playground Equipment & Surfacing Project. f) All work to be done in compliance with all government agencies including but not limited to: City of Lincolnton, Lincoln County, OSHA, NC DEMLR Land Quality and Aquifer Protection Sections, NC DEQ Water Quality, US Army Corps of Engineering, and the Federal American with Disabilities Act guidelines. Contact Information: City of Lincolnton Public Services Highland Drive Park - Playground Equipment & Surfacing Project PO Box 61 114 W. Sycamore St., Lincolnton, NC 28093 Business Hours: 8:30 AM - 5:00 PM Mon-Fri Contact Persons: J.David Ledford - Project Manager * jdavidledford@yahoo.com (704) 530-7880 Nathan Eurey - City of Lincolnton Director of Public Services neurey@lincolntonnc.org (980) 241-7984

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents