Similar Projects
Sewer Excavation and Repair Services
Infrastructure
Post-Bid
Belle Mead, NJ

Cleaning and Television of 27-In Interceptor
Infrastructure
Post-Bid
Somerville, NJ

Interceptor Siphon Sewer Cleaning and Inspection Services
Results
Bridgewater, NJ 08807

East Oak and Stonehouse Sanitary Sewer Smoke Testing and CCTV Inspection Project
Results
Basking Ridge, NJ 07920

Boroughs Wastewater Collection System
Infrastructure
Post-Bid
Somerville, NJ

Sanitary Sewer Rehabilitation - Marcy Street Area
Results
Somerset, NJ 08873

4540--Storm and Sanitary Sewer Cleaning and Jetting
Results
Lyons, NJ 07939

Old Farm Road Sanitary Sewer Extension and Road Restoration Project
Results
Bridgewater, NJ

West End Avenue Sanitary Sewer Replacement
Results
North Plainfield, NJ 07063

Manhole Rehabilitation
Infrastructure
Results
Less than $926,000 est. value
Somerville, NJ 08877

Septic Pumping, Removal and Disposal Services
Infrastructure
Results
Somerville, NJ

2021 East Oak, Stonehouse, Crown Court, and Rebel Hill Infiltration and Inflow Implementation Project - Phase I
Infrastructure
Results
Basking Ridge, NJ

Wastewater Flow Metering System Maintenance, Calibration, and Repair Services
Term Contract
Results
Bridgewater, NJ

Bell Avenue Sewer and Road Repairs
Infrastructure
Results
Raritan, NJ 08869

Reconstruction of Eleven (11) Sewer Laterals
Infrastructure
Results
$225,000 est. value
NJ

Reported 07/01/2022 12:00 AM
Project Title

Jefferson Avenue Sanitary Sewer Replacement

Physical Address View project details and contacts
City, State (County) North Plainfield, NJ   (Somerset County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of abandonment, and removal and disposal of 8-inch and 4-inch sanitary sewer, associated 4-inch vitrified clay sanitary sewer laterals, and four (4) sanitary sewer manholes; installation of 455 linear feet of 8-inch diameter Class 52 Ductile Iron pipe with ceramic epoxy interior lining and SDR-35 PVC sanitary sewer pipe; installation of 155 linear feet of 4-inch Class 52 Ductile Iron pipe with ceramic epoxy interior lining and SDR 35 PVC pipe sanitary sewer laterals; installation of six (6) sanitary sewer manholes; maintenance of gravity wastewater flows; and the implementation of traffic control. The work is located along Jefferson Avenue and Walnut Street within the Borough of North Plainfield. Work includes all general construction, site work, and sewer work necessary to complete the project. The work shall be substantially completed within 90 consecutive calendar days of the Contractor's receipt of written Notice to Proceed, except for final pavement restoration on Jefferson Avenue and Walnut Street which shall take place no sooner than 90 consecutive calendar days after Substantial Completion and no later than 240 consecutive calendar days after the Contractor's receipt of written Notice to Proceed

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents