Similar Projects
Replacement of Lead Service Lines at Various Locations - Contract 2022-1
Infrastructure
Bidding
$2,567,025 est. value
Grand Rapids, MI

2022 Lead Service Line Replacements
Infrastructure
Bidding
$1,000,000 est. value
Inkster, MI

4610--Reverse Osmosis Equipment PM
Post-Bid
Ann Arbor, MI 48105

Replacement of Steam Manhole 81
Post-Bid
Lansing, MI 48937

Hangar 665 Expansion and Watermain Upgrades Project
Addition - 22,000 SF
Results
Less than $10,000,000 est. value
Gwinn, MI

M-21 (Lincoln Ave) Water Main, M-66 (State Street) to Baldie Street
Results
Ionia, MI 48846

Replacement of Private Lead Service Lines at Various Locations - Contract 2022-3
Infrastructure
Bidding
$1,000,000 est. value
Grand Rapids, MI

Fort Wilkins Historic State Water System Upgrades
Post-Bid
Copper Harbor, MI 49918

Michigan Avenue at Paint Creek Water Main Rehabilitation
Results
Ypsilanti, MI

2022-2023 DWRF Water Main Replacement Project
Infrastructure
Bidding
$200,000 est. value
Eastpointe, MI

Fire Hydrant Removal and Replacement
Post-Bid
Milan, MI

23 Mile Road Water Main
Results
Chesterfield, MI

Lapeer Lead Service Line Replacements
Infrastructure
Bidding
$550,000 est. value
Lapeer, MI

23 Mile Road Water Main Replacement
Infrastructure
Post-Bid
Macomb, MI

Lead Service Line Replacement and Service Line Materials Verification Program
Results
Ferndale, MI

Last Updated 06/06/2022 05:32 AM
Project Title

Water System Improvements, 7th and 8th Streets: Oakwood to Summit Amsterdam, Rotterdam, and Summit Avenues, Contract 1

Physical Address View project details and contacts
City, State (County) Muskegon Heights, MI   (Muskegon County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,016,560 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following approximate quantities: 5,760 ft. of 4-inch to 18-inch water main 106 full water service replacements 1,000 ft. of 12-inch storm sewer 4,500 ft. of road reconstruction

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents