Similar Projects
Last Updated | 11/10/2022 09:32 AM |
Project Title | Landfill Phase 5 Expansion - Rowan County |
Physical Address | View project details and contacts |
City, State (County) | Salisbury, NC 28147 (Rowan County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Misc. Buildings, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $6,100,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of November 10, 2022, this project is in the final planning phase. It is anticipated bidding will commence in the near future. It is anticipated bidding will commence mid-November 2022, with construction starting January 2023. Rowan County is seeking to construct new Phase V at the Rowan County MSW Landfill. Rowan County requests bids to provide the necessary materials, labor, equipment and supervision to adequately construct approximately 19.2 acres of the Subtitle D lined Phase V of the Rowan County MSW Landfill. The project shall include all surveying, site prep, earthwork, installation and any other identified components required to provide a complete and finished project. Specific bidding instructions and clarification will be provided at the pre-bid meeting. Detailed Scope of Work: • Furnish the necessary supervision, labor, tools, equipment, and materials to complete the required work as outlined. • The Bidder shall verify any and all measurements pertaining to this project. • Excavation/structural fill of soil to achieve subgrade elevations • Soil stockpiling • Installation of a liner system consisting of some or all of the following: o Structural fill o Low permeability soil liner o Geosynthetic clay liner (GCL) o 60-mil High-Density Polyethylene (HDPE) textured and smooth liner o Geocomposite drainage layer (Geonet) o Leachate collection pipes and installation o Collection stone and protective cover placement o Rain cover installation • Stormwater management system installation for the stockpile(s) • Construction of paved and stone access roads • Associated site work described in the Plans and Specifications. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |