Similar Projects
Meter And Booster Stations
New Construction
Results
Cloquet, MN

Ridgedale Booster Station Improvements
Results
$450,000 est. value
Minnetonka, MN 55345

Lincoln Pump Station Improvements
Renovation
Results
$160,000 est. value
Lake Benton, MN

Wood Lake Lift Station Improvements
Results
$625,000 est. value
Richfield, MN

Williston Road Lift Station Rehabilitation
Results
$1,950,000 est. value
Minnetonka, MN

2021 Lift Station Improvements
Bidding
Vadnais Heights, MN

Lift Station Maintenance and Repair Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

Construction of a Booster Station
Results
Less than $350,000 est. value
Saint Louis Park, MN 55426

Rehabilitation of Lift Station 6
Renovation
Results
Brooklyn Park, MN

Booster Station Replacement
Post-Bid
Proctor, MN

DNR4 Gilfillan Lake WMA Pump Control Replacement
Renovation
Results
$35,000 est. value
MN

2021 Sanitary Lift Station No. 33 and No. 34 Improvements
Renovation
Post-Bid
$532,065 est. value
Moorhead, MN

Storm Lift Station Improvements
Results
$735,000 est. value
Eagan, MN

Waverly Lake Phase 4 Improvements
Results
$3,500,000 est. value
Waverly, MN

Sanitary Lift Station No. 2 Improvements
Bidding
$230,000 est. value
Maple Lake, MN

Reported 01/20/2021 12:00 AM
Project Title

DNR2 RFB Brainerd Office Replacement Lift Pumps

Physical Address View project details and contacts
City, State (County) Brainerd, MN 56401   (Crow Wing County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary for replacement of the lift pump system at the Brainerd DNR Area Office. - Remove and properly dispose of existing pumps and rail systems - Provide and install 2 new rail systems using 2 inch 304SS schedule 40 pipe to work with the new pumps - Provide and install (2) new floats, sized and designed to work with new pumps and rail systems - Provide and install (2) new Sulzer ABS XFP 100C Pumps or preapproved equivalent (see substitutions section for submitting a request) with guide brackets and seal leak/over temp relays and all parts necessary to complete the project - Test system to ensure proper function of the system upon completion

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents