Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

FY 2023 - Bridge Painting
Infrastructure
Bidding
$1,243,506 CJ est. value
Newark, OH 43055

FY 2023 - Bridge Painting
Infrastructure
Bidding
$1,243,506 CJ est. value
Newark, OH 43055

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Road Maintenance
Post-Bid
Croton, OH

Street Improvements
Results
$150,000 est. value
Gratiot, OH

Oregon Street Reconstruction Phase III
Results
$657,277 est. value
Hartford, OH 43013

Amazon Web Services - 3rd Data Center / New Albany
New Construction, Infrastructure - 170,000 SF
Pending Verification
$400,000,000 CJ est. value
New Albany, OH 43031

Amazon Web Services - 3rd Data Center / New Albany
New Construction, Infrastructure - 170,000 SF
Pending Verification
$400,000,000 CJ est. value
New Albany, OH 43031

Contract A - Avondale Water Main Extension Phase 2
Infrastructure
Design
$1,560,037 CJ est. value
Chatham Township, OH 44275

Bridge Repair - US 62
Infrastructure
Bidding
$385,397 CJ est. value
Chatham, OH 43055

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

2021 City of Pataskala Paving Project
Results
Pataskala, OH

Green Chapel Road from 62 to Clover Valley Road - Ohio Department of Transportation
Infrastructure
Pending Verification
$19,500,000 CJ est. value
Johnstown, OH 43031

Last Updated 09/13/2022 08:10 AM
Project Title

IR 70 - Four Lane Resurfacing

Physical Address View project details and contacts
City, State (County) Buckeye Lake, OH 43025   (Licking County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $9,464,932 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface with related work on IR 70 in Fairfield County and in Licking County through the SR 158 interchangeMaintenance work and minor repairs will be completed on various bridges along this section of FAI/LIC IR 70.Coordination Note with PID 95639 (D6) OHDOT - IR 70 - Four Lane Resurfacing

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents