Similar Projects
Habitat for Humanity Homes
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Macon, GA 31201

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

Patrick Mill Rd / Harbins Rd at Apalachee River 3.6 Mi S of Carl
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Winder, GA 30680

SR 29 BU/US 441bu at Fishing Creek in Milledgeville
Demolition, New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Milledgeville, GA 31061

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Meriwether Place
New Construction, Infrastructure - 4,400 SF
Sub-Bidding
$20,000,000 CJ est. value
Milledgeville, GA 31061

Max Fitness / Macon
New Construction, Infrastructure - 40,703 SF
Post-Bid
$12,000,000 CJ est. value
Macon, GA 31210

Winder Annual Contractor
Term Contract
Post-Bid
Winder, GA 30680

Hamilton Crossing Waterline Relocation
Infrastructure
Results
$650,000 est. value
Cartersville, GA

Agriculture Meter Installation
Infrastructure
Results

The Preserve - Phase 3
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Macon, GA 31220

New Amphitheater Facility
New Construction, Infrastructure
Construction
$34,197,844 CJ est. value
Macon, GA 31201

Forsyth Street Convenience Store and Gas Station
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Macon, GA 31201

The Villas At Moseley Dixon
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Macon, GA 31220

Last Updated 03/10/2023 03:12 PM
Project Title

Water Meter Replacement

Physical Address View project details and contacts
City, State (County) Twin City, GA 30471   (Emanuel County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Water Meter Replacement Installation and GPS location of approximately 707 water meters and appurtenances, relocate water meters, replace meter box and lids as necessary. Time allotted installation is 90 consecutive calendar days. Work to be Done: Project consists ofthe furnishing of all materials, labor and equipment for the complete construction of Water Meter Replacement for the City of Twin City, Georgia consisting of: The work to be done consists offurnishing all materials (excluding 5/8" x 3x4" and 1 " meters), equipment and labor for the construction of: Installation and GPS location of approximately 707 water meters and appurtenances, relocate water meters, replace meter box and lids as necessary. Time allotted for installation is 90 consecutive calendar days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents