Similar Projects
Osceola Village Center Daybreak Market
New Construction, Infrastructure - 4,800 SF
Design
Kissimmee, FL 34741

WaWa and Quick-Service Restaurant
New Construction
Design
Kissimmee, FL

Starbucks - Shell
New Construction - 2,500 SF
Post-Bid
Saint Cloud, FL

Portillo's Restaurant
New Construction - 7,979 SF
Post-Bid
Kissimmee, FL 34746

La Coriana Restaurant
Renovation - 1,260 SF
Construction
$80,000 est. value
Kissimmee, FL 34746

AmeraTrail Headquarters and Manufacturing Plant - Phase II
New Construction - 75,000 SF
Construction
Saint Cloud, FL 34772

Dunkin
New Construction - 1,960 SF
Pending Verification
Davenport, FL

Waterstar Orlando Planned Development - Parcel B
New Construction, Infrastructure - 167,322 SF
Pending Verification
$200,000,000 CJ est. value
Kissimmee, FL 34747

St. Cloud Marketplace - Phase 1
New Construction - 29,065 SF
Design
Saint Cloud, FL

Nolte Multi-Tenant Retail Center - Phase I and II
New Construction - 8,700 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Saint Cloud, FL 34769

Dunkin' Donuts
Renovation - 2,104 SF
Construction
$100,000 est. value
Buena Ventura Lakes, FL 34743

NeoCity Tech District Mixed-Use Development
New Construction, Infrastructure - 1,164,920 SF
Pending Verification
$1,200,000,000 CJ est. value
Kissimmee, FL 34744

Golden Corral
New Construction - 10,416 SF
Design
$1,200,000 est. value
Kissimmee, FL

Outback Steakhouse #1059
New Construction - 6,543 SF
Post-Bid
Kissimmee, FL 34747

Starbucks - Shell
New Construction - 2,562 SF
Construction
$500,000 est. value
Kissimmee, FL 34744

Last Updated 01/04/2023 12:01 PM
Project Title

Celebration Brewing

Physical Address View project details and contacts
City, State (County) Celebration, FL 34747   (Osceola County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Food/Beverage Service, Manufacturing/Processing Plant
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 4, 2022, construction is underway with plans to open in Spring 2023.

Details

1 Story Above Grade, 4,563 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Laboratory Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents