Similar Projects
Fy22 Rochester Pier Repair
Alteration
Design
Rochester, NY

Fourth Lake Fishing Access Site
Infrastructure
Bidding
$250,000 est. value
Inlet, NY

Construction of Fixed Pier and Floating Dock
Infrastructure
Bidding
$250,000 est. value
Manhasset, NY

Champlin Beach Infrastructure Improvements
Post-Bid
Hammondsport, NY 14840

Removal of Concrete Floating Docks
Post-Bid
Buffalo, NY

Replace Deteriorating Dock System at Cedar Point State Park
Results
Less than $540,222 est. value
Clayton, NY 13624

Replace Deteriorating Dock System at Mary Island State Park
Results
Less than $252,194 est. value
Alexandria Bay, NY

Battery Coastal Resilience Project
Renovation
Pending Verification
New York, NY 10012

Redevelop Underutilized Public lands on Inlet Island
Post-Bid
Ithaca, NY

East Jetty Reconstruction at Golden Hill State Park
Results
Barker, NY 14012

City Docks Maintenance and Repair - Furnish and Install
Term Contract
Post-Bid
NY

Yonkers Pier Repairs
Results
Yonkers, NY 10701

Gansevoort Peninsula Marine Construction Phase 2
Infrastructure
Post-Bid
New York, NY 10011

Marina Bulkhead Repairs
Results
New Rochelle, NY 10801

Alexandria Bay Sidewalk and Dock Improvements
Infrastructure
Post-Bid
$900,000 est. value
Alexandria Bay, NY 13607

Last Updated 04/27/2022 02:56 PM
Project Title

Repair of Fort Slocum Dock

Physical Address View project details and contacts
City, State (County) New Rochelle, NY 10805   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To repair damage that occurred to the Fort Slocum Dock, located at 95 Fort Slocum Road in New Rochelle, New York, during the winter storm that occurred on February 05, 2022. See pictures in attachment. Scope of work consists of the following: 1. Remove & Dispose of Broken Pile 2. Remove & Dispose 3” x 10” “X” Framing 3. Remove & Dispose all old fasteners 4. Furnish and install one (1) 40’ CCA 8” x 10” butt pile. Wood pile to be driven to refusal and trimmed. 5. Furnish and install four (4) 3” x 10” x 24’ CCA planks 6. Furnish and install twelve (12) 24” galvanized timber bolts 7. Furnish and install twenty-four (24) 10” galvanized timber bolts.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents