Similar Projects
WWTP Consolidation Project Phase III
New Construction
Conception
$4,000,000 est. value
Pasadena, TX 77505

69th Street Wastewater Treatment Plant - R-000509 - City of Houston
Renovation
Conception
$32,740,000 est. value
Houston, TX 77011

New Multi-Use Solid Waste Department Facility
New Construction
Design
Houston, TX 77026

AJOB Wastewater Treatment Plant Sluice Gate Replacement
Renovation
Bidding
Houston, TX

RFQ D/B - Design-Build Services for George Bush International Airport (IAH) Central Utilities Plant
Renovation
Bidding
$350,000 CJ est. value
Houston, TX 77032

Construction of Water Plant No. 1 and Lift Station No. 1 Perimeter Fence
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Cypress, TX 77433

Replace Cor Paks for Dryer Furnace System
Renovation
Sub-Bidding
$190,000 CJ est. value
Houston, TX 77011

White Oak WWTP Catwalk Grating Replacement
Renovation
Post-Bid
TX 77282

On-Site Sludge Conveyor System Belt Modification Service
Renovation
Post-Bid
Houston, TX

Ulitmate Wastewater Treatment Plant Phase 3 Expansion - 0.72 MGD - Construction
Results
$2,100,000 est. value
Houston, TX 77056

Replacement of Grit Classifier at Wastewater Treatment Plant
Results
Less than $226,000 est. value
Houston, TX 77024

New 0.2875 MGD ADF Wastewater Treatment Plant
New Construction
Construction
$2,553,943 est. value
Houston, TX

Wastewater Plant Phase One
New Construction
Construction
TX

The Grand Prairie Wastewater Treatment Plant Phase I (0.25 MGD)
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Hockley, TX 77447

Wastewater Treatment Plant Improvements
Renovation
Post-Bid
TX

Last Updated 07/28/2022 12:03 PM
Project Title

Water Plant Conversion to Chloramine Disinfection - Contract No. 1

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $457,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for the construction related to the addition of an orthophosphate system and the conversion of the existing disinfection system at Water Plant No. 1 to Chloramines and the addition of treated surface water to serve the West Harris County Municipal Utility District No. 17. Proposals must be accompanied by a certified or cashier's check or a bid bond from a surety company holding a permit in the State of Texas for an amount equal to 5% of the amount bid. The amount of said certified or cashier's check or bond will be forfeited to the OWNER and the bank or surety shall be liable to the OWNER for the amount in the event the successful bidder shall fail or refuse to enter into a contract or furnish bonds as hereafter required within ten (10) days after the date of notice of award. If a certified or cashier's check is provided, the successful bidder shall deliver, at the ENGINEERS office (IDS Engineering Group, 13430 Northwest Freeway, Suite 700, Houston, Texas 77040), the original certified or cashier's check within twenty-four (24) hours of the bid opening. The successful bidder must furnish a performance bond and a payment bond on the forms provided, each in the amount of 100% of the Contract price from a surety company licensed by the State of Texas. The OWNER reserves the right to reject any or all bids and to waive informalities or irregularities in bidding. In case of lack of clarity in stating prices, the OWNER reserves the right to consider the most advantageous construction thereof or reject the bid. The deadline to ask questions is 4/29/2022 12:00 AM CST

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents