Similar Projects
Last Updated | 07/26/2023 02:54 PM |
Project Title | Farm 4 Pipe Installation |
Physical Address | View project details and contacts |
City, State (County) | Boardman, OR 97818 (Morrow County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $605,173 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Description: Supply of labor, equipment, and miscellaneous materials. The project consists of the installation of approximately 60,000 feet of farm pipe, valves and fittings per spec and details. Bidder to include concrete materials for thrust blocks all other materials provided by owner. Field testing will be the responsibility of the bidder. Farm 4 Pipe installation Bids will not be accepted after this hour and date. Port of Morrow will be acting as the General Contractor for this project. Port of Morrow reserves the right to award or reject for good cause, any or all bids, or to postpone the award of the contract upon finding that it is in the public interest to do so. Each bid must contain a statement as to Every request for such interpretation should be requested by email at bids@portofmorrow.com or in writing and addressed to Port of Morrow, P. O. Box 200, Boardman, OR 97818 and to be given consideration must be received at least 48 hours prior to the date fixed for the opening of bids. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |