Similar Projects
Fire Suppression Services at PNSY
Post-Bid
Kittery, ME

Windham Field Allen SRRF Sprinkler System
Post-Bid
Windham, ME 04062

NFPA 13 Sprinkler Systems Additions
Results
Berwick, Lebanon, North Berwick, ME 03901

Fire System Inspections, Service and Replacements
Alteration
Results
Newport, ME

Windham Field Allen SRRF Underground Sprinkler and Domestic Water Service Upgrade
Post-Bid
Windham, ME 04062

Fire Extinguisher and Suppression System Annual Inspection and Service (Statewide)
Term Contract
Results

J Richard Martin Community Center Fire Protection
Alteration
Post-Bid
Biddeford, ME 04005

Sprinkler Head Replacement at Melvern Belmont Estates
Alteration
Results
Bar Harbor, ME

On-Call Services for General Facilities and Mechanical Maintenance
Term Contract, Alteration
Post-Bid
Less than $50,000 est. value
Orono, ME

15 Columbia Street Fire Alarm Upgrades
Alteration
Results
$91,000 est. value
Augusta, ME 04330

Gignoux Courthouse HVAC and Fire Alarm Replacement - CMC Sources Sought Services
Term Contract
Post-Bid
Portland, ME 04101

Service, Inspection and Testing and Maintenance of Fire Extinguishers and Fire Extinguisher Systems
Alteration
Results
Lincolnville, Rockland, Tremont, ME

Readfield Fire Station Fire Suppression System
Alteration
Post-Bid
Readfield, ME 04355

Fire Alarm System Upgrade and Installation
Alteration
Results
Presque Isle, ME

Reported 03/16/2022 12:00 AM
Project Title

Neville Hall Sprinkler, Phase 1

Physical Address View project details and contacts
City, State (County) Orono, ME 04469   (Penobscot County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Sprinkler installation of Phase 1 work as identified in the contract documents. The University is separately doing a significant renovation in Neville Hall. The Sprinkler Contractor will be required coordinate all work they are required to accomplish as part of Neville Hall Sprinkler, Phase 1 with the work the University is accomplishing.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents