Similar Projects
Kimball Avenue Shared Use Path (Phase 2) - City of South Burlington
Infrastructure, Alteration
Conception
$400,000 est. value
South Burlington, VT 05403

Bartlett Bay Upgrades - City of South Burlington
Infrastructure
Conception
$17,600,000 est. value
South Burlington, VT

Brookside Cottages
New Construction - 79,200 SF
Design
$785,000 est. value
Putney, VT

Site Development for 33 Mobile Home Site for Tri-Park Properties
Infrastructure
Design
Brattleboro, VT

Warren Covered Bridge Rehabilitation - Rebid
Infrastructure
Bidding
$1,000,000 CJ est. value
Warren, VT 05674

Smugglers Notch Parking and Stormwater Improvement
Infrastructure
Bidding
$1,500,000 CJ est. value
E Fairfield, VT 05448

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

Founder's Hall Demolition, New Walkways, and Lawn Area
New Construction, Demolition
Construction
$715,000 est. value
Colchester, VT

The Rowland Project
New Construction - 2,500 SF
Construction
$20,000,000 est. value
Manchester Village, VT 05254

Commerce Avenue Force Line Replacement - City of South Burlington
Infrastructure
Conception
$275,000 est. value
South Burlington, VT 05403

Chester GMRC(25)
Infrastructure
Design
$1,000,000 CJ est. value
Town of Rockingham, VT 05101

Burton Island State Park Toilet Building Renovation and New Shower Buildings
New Construction, Infrastructure, Renovation
Bidding
$1,822,000 CJ est. value
Saint Albans, VT 05478

ACSWMD Transfer Station and Office Wastewater and Site Improvements Project
Infrastructure
Results
$162,000 est. value
Middlebury, VT 05753

Spruce Place
New Construction - 27,122 SF
Construction
$2,493,540 est. value
Berlin, VT

Last Updated 11/01/2022 07:02 PM
Project Title

Front-Line Rearing Ponds Improvements

Physical Address View project details and contacts
City, State (County) Bennington, VT 05201   (Bennington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $781,115 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of, but is not limited to: Constructing new concrete training walls around the first pond, pond #1, of the 4 front line rearing ponds, replacing a concrete water level control structure, flume, between pond #1 and pond #2. Repairing the concrete apron at the outlet of the concrete raceways at the upstream end of pond #1. The new concrete water level control structure, flume, will include a new drain to be connected to the main drain line for the hatchery facility. The new concrete training walls, replacement water level control structure, flume and drain are to improve operations and maintenance of the ponds. The existing concrete apron at the outlet of the concrete raceways is in very poor condition and in need of repair. In addition, the project will include a new bypass system and drain for the concrete headbox at the upstream end of the existing concrete raceways to improve operations and maintenance of the headbox. The project will also include erosion prevention and sediment control measures, cofferdams and control of water systems, piping, valves, earthwork and all other appurtenances and incidental work necessary to complete the project. This is a rebid of a larger project that included new concrete training walls around all 4 front line rearing ponds and new water control structures, flumes, between all the ponds. The revised project includes the headbox bypass system and drain, repairs to the concrete apron at the outlet of the concrete raceways, concrete training walls around pond #1 and a short portion of pond #2 to tie in a new flume between ponds #1 and #2 and the associated drain. The plans, bid sheet, the Scope and Sequence of Work and the Measurement and Payment sections of the specifications have been revised to reflect the reduced scope of the project. Plans indicate Not in Contract (N.I.C) for elements that will be included in a future phase. The time period window for construction of this project is fairly narrow, from early June to no later than mid-July, due to need to manage the fish stock. Basically, the period from when trout in the ponds are removed for stocking until new trout to be raised for next year's stocking are put back in the ponds.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents