Similar Projects
Everett Road Water Meter Supply
Infrastructure
Bidding
East Freedom, PA

Lead Service Line Replacements
Infrastructure
Bidding
West View, PA 15143

Judicial Center - Water Intrusion Repairs
Post-Bid
$1,000,000 to $2,000,000 est. value
Harrisburg, PA 17120

Furnish Type K Copper Pipe
Post-Bid
New Stanton, PA 15672

Forcemain Improvement Project
Results
PA

University Drive Road / Curb And Waterline Loop Repairs Sitework
Results
$900,000 est. value
Hazleton, PA 18202

Bartram's Mile Maintenance Building and Water Service Extension
Renovation
Construction
$43,000,000 est. value
Philadelphia, PA 19143

Wolf Creek Raw Water Main - General Construction
Infrastructure
Bidding
$1,400,000 to $1,600,000 est. value
Port Carbon, PA 17965

J045--Backflow Preventers Erie VAMC
Post-Bid
Erie, PA 16504

Ductile iron Pipe and Fittings
Results
Hanover, PA 17331

Andover Utility Replacement Project
Infrastructure
Bidding
Dover, PA

Installation of 620` of 6" C900, DR14, PVC Water Main along Cherrington Drive, from Thompson Run Road to South Harelston Drive
Post-Bid
PA

Cherry Valley Road Waterline Replacement Project
Results
Less than $335,000 est. value
Forest Hills, PA 15221

Water System Improvements Project
Post-Bid
$3,300,000 est. value
Bedford, PA 15522

Plastic Pipe
Results
New Castle, PA 16101

Last Updated 11/09/2021 08:21 AM
Project Title

Construction of Water Mains - 6” Main/Elm Street and 3rd Street to 6th Street

Physical Address View project details and contacts
City, State (County) Lebanon, PA 17042   (Lebanon County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $606,817
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The overall Project encompasses the construction of water mains consisting of approximately 2,800 lineal feet of 6” Class 54 ductile iron pipe, 30 lineal feet of 8” Class 54 ductile iron pipe, 935 lineal feet of 4” HDPE pipe with tracer wire, forty-six (46) service connections from the new main to and including the curb stop and meter pit and replacement of five (5) hydrants. Note: For bidding purposes, as well as actual construction on the site; close examination of the prints is necessary due to the crossing of multiple utilities.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents