Similar Projects
Grading, Interim Surfacing
Infrastructure
Conception
$20,549,000 CJ est. value
Clear Lake, SD 57226

Grading, Interim Surfacing
Infrastructure
Conception
$20,549,000 CJ est. value
Clear Lake, SD 57226

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Cold Milling Asphalt Concrete Asphalt Concrete Resurfacing 26K Ton, Pipe Work, Modify Intersection
Infrastructure
Post-Bid
SD

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Concrete Surfacing
Infrastructure
Results

AC Surfacing - SD 15
Infrastructure
Conception
$6,533,000 CJ est. value
Clear Lake, SD 57226

Road Repair, Blading, Snow Removal
Term Contract, Infrastructure
Post-Bid
Astoria, SD

Bridge Deck Sweeping in the Watertown Area
Infrastructure
Results
Watertown, SD

AC Surfacing, Mill, AC Resurfacing - SD 28
Infrastructure
Conception
$11,390,000 CJ est. value
Toronto, SD 57268

Water Main Construction
Infrastructure
Post-Bid
$500,000 CJ est. value
Clear Lake, SD 57226

Rout and Seal
Infrastructure
Results

Urban Grading, AC Surfacing, Curb and Gutter, Sidewalk, Lighting - SD 28
Infrastructure
Conception
$3,804,000 CJ est. value
Toronto, SD 57268

Asphalt Paving 7th Avenue and Curb Line Paving
Infrastructure
Results
Clear Lake, SD

Last Updated 02/17/2023 08:05 AM
Project Title

Grading, Interim Surfacing, Replace Str RCBC, Approach Slab

Physical Address View project details and contacts
City, State (County) Toronto, SD 57268   (Deuel County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $19,242,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD28 - Fm Estelline to SD15 Length 9.2 As of February 17, 2023, the project is in Conceptual status. Anticipated Construction year is 2025. SDDOT - Grading, Interim Surfacing, Replace Str RCBC, Approach Slab *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents