Similar Projects
Heating and Air Conditioning Replacement Scattered Sites
Alteration
Bidding
$400,000 est. value
East Chicago, IN

Contractor - EJB R-22 HVAC Unit Replacements
Alteration
Bidding
$500,000 to $1,000,000 est. value
Indianapolis, IN 46249

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

IN031 Coleman Hall Replace HVAC Boxes and Controls
Results
Indianapolis, IN 46202

Ivy Hall Chiller Replacement
Results
Less than $700,000 est. value
Lafayette, IN 47905

Repair Condensate System
Alteration
Bidding
$250,000 to $500,000 est. value
Indianapolis, IN 46202

Air Handler Replacement Pike Central Middle School
Post-Bid
Petersburg, IN

Bl579 Data Center Rm 143 Cooling System Relocation
Results
Bloomington, IN 47408

Facilities Services Building - HVAC Upgrades
Alteration
Bidding
$400,000 est. value
Gary, IN 46408

Cooling Tower Replacement
Post-Bid
North Vernon, IN 47265

IN071 Engineering and Technology Replace AHU-1 Components
Results
Indianapolis, IN

Facilities Services Annex Building - HVAC Replacement
Alteration
Bidding
$150,000 est. value
Bloomington, IN

HVAC Controls
Post-Bid
North Vernon, IN 47265

BL608 Mesh - Decommission HVAC Equipment
Results
Bloomington, IN 47408

Last Updated 07/20/2022 02:34 PM
Project Title

Boiler and Chiller Treatment

Physical Address View project details and contacts
City, State (County) Terre Haute, IN 47802   (Vigo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The services will encompass the provision of boiler and chiller water treatment services at the Federal Correctional Complex (FCC) Terre Haute located Terre Haute, Indiana in accordance with the Statement of Work (SOW). These services will be performed at the Central Utilities Plant at FCC Terre Haute. The Federal Bureau of Prisons Field Acquisition Office intends to establish a contract for the provision of boiler and cooling tower services. The contractor shall provide all necessary labor, equipment and materials for proper chemical installation, accounting and testing of all chemicals utilized in the operation the boilers, water softeners, water delivery systems, at the Central Utility Plant, at the Federal Correction Complex (FCC) located at 4700 Bureau Road North, Terre Haute, Indiana, 47802.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents