Similar Projects
The Davis Community
New Construction - 211,475 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28411

Olive Branch Road Development
New Construction
Conception
Durham, NC

The Woodlands At Echo Farms Tract 3C
New Construction - 113,007 SF
Design
$10,000,000 CJ est. value
Wilmington, NC 28412

Walter Tower
New Construction - 315,000 SF
Design
Raleigh, NC 27609

Kingsley Park
New Construction
Post-Bid
Fayetteville, NC

Parkwood West
New Construction
Post-Bid
Fayetteville, NC

Public Housing Redevelopment Services
Results
Chapel Hill, NC

Morrisville Town Center Core - Phase I
New Construction - 277,300 SF
Results
$13,000,000 to $44,400,000 est. value
Morrisville, NC

Vermillion Village
New Construction - 10,000 SF
Construction
Huntersville, NC 28078

The Terraces
New Construction, Addition
Construction
Charlotte, NC 28210

Sea Glass Harbour
New Construction
Pending Verification
Wilmington, NC 28412

Timber Farms
New Construction
Pending Verification
Ocean Isle Beach, NC 28469

Spring Ridge Townhomes
New Construction
Conception
Wilmington, NC

Hudson Oaks Townhomes
New Construction
Design
Charlotte, NC 28205

Annual Unit Bid Process for Emergency Home Repair Program
Renovation
Post-Bid
NC

Reported 06/21/2022 09:09 AM
Project Title

Roberson Comer Townhomes

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27455   (Guilford County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $54,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a multi-residential development in Greensboro, North Carolina. Conceptual plans call for the construction of a 142-unit multi-residential development. Plans call for the construction of 142 townhomes. As of January 5, 2022, this project is in the early planning stages. It will be reviewed by the Greensboro Technical Review Committee on June 17, 2022. No building permits have been applied for at this time. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to fourth quarter of 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Multi-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents