Similar Projects
Construction – HVAC/Drywall. Ceiling-Mounted Dx Split Systems, Roof-Mounted Air-Cooled Condensers, Metal Ductwork, Shaft Wall, Alarm, Control System, and Field Training.
Term Contract
Design
$100,000 to $250,000 est. value
Newport, RI

Building 1176 Air Handler Unit Replacement (Naval Undersea Warfare Center, Newport, Rhode Island)
Term Contract
Design
$500,000 to $1,000,000 est. value
Newport, RI 02841

Construction - B1320 HVAC Retrofit
Bidding
$100,000 to $250,000 est. value
Newport, RI 02841

HVAC Systems, Repair and Replacement FY22 - One-Year Contract with Two One Year Options for Renewal
Term Contract
Bidding
Providence, RI

Boiler Plant 7CC Condensate System Repairs
Post-Bid
$500,000 to $1,000,000 est. value
Newport, RI 02841

Air Handler Unit Repairs
Post-Bid
$25,000 to $100,000 est. value
Newport, RI 02841

Dust Collection System
Results
Providence, RI

HVAC Upgrades
Results
$100,000 to $250,000 est. value
Newport, RI 02841

North Kingstown High School Ac Improvements
Post-Bid
North Kingstown, RI 02852

Powers Building - HVAC Terminal Box Control Upgrade Phase II
Results
North Providence, RI 02908

Ductless-Split Heating and Air Conditioning Systems
Post-Bid
Warwick, RI 02888

Heating, Ventilating and Air Conditioning (HVAC) Maintenance, Boiler, Burner Repair Services
Results
North Kingstown, RI 02852

HVAC Replacement
Post-Bid
$100,000 to $250,000 est. value
Newport, RI 02840

Police and Fire Headquarters HVAC Improvements
Results
North Kingstown, RI 02852

Fire Alarm and HVAC Controls Upgrades at Lawn and Melrose Schools
Post-Bid
Jamestown, RI 02835

Last Updated 06/18/2021 04:09 PM
Project Title

Construction - Locker Room HVAC

Physical Address View project details and contacts
City, State (County) Newport, RI 02841   (Newport County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all necessary materials, labor, services, equipment, and incidental related work as required to provide a new complete and usable HVAC system per the accompanying drawings and specifications. The work shall include but not be limited to the following: - Removal of existing roof top exhaust fans. - Provide and install new roof top unit, including all required roof working and supports, electrical wiring and conduit, duct work, crane services, and other incidental work required for the installation. - Provide and install new insulated ductwork, diffusers, dampers, and other required accessories to provide air-side distribution as shown on drawing. - Provide and install HVAC DDC controls including controllers, wiring, input and output devices, programming, and all other materials and labor as required to achieve proper control functions as stated on drawing. - Removal and re-installation of existing suspended ceiling, and select cutting of openings in walls (above ceiling) as required for installation of ductwork. Provide patching, painting, and restoration of existing room finishes resulting from damage or required modifications associated with this project. - Provide all other incidental, labor, materials, and services required for the successful completion of the work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents