Similar Projects
2022 Capital Improvements - Jamestown Public Schools District
New Construction, Renovation, Infrastructure
Design
$86,500,000 CJ est. value
Jamestown, NY 14701

I-86 / Chautauqua Lake; Bridge Rehab
Infrastructure
Design
$49,000,000 CJ est. value
Stow, NY 14710

Replace Turf Field at State University of New York (SUNY) Fredonia
Infrastructure
Bidding
$500,000 CJ est. value
Fredonia, NY 14063

Jamestown Public Schools Capital Project Phase 2 at Jamestown High School - BP-01 Site Work
Infrastructure
Bidding
$1,453,000 CJ est. value
Jamestown, NY 14701

Station No. 2 Drainage Project
Infrastructure
Post-Bid
$218,000 CJ est. value
Ripley, NY 14775

Cold-In Place Recycling and Overlay CR141
Infrastructure
Post-Bid
$400,000 CJ est. value
Hanover, NY 14136

Elastomeric Bridge Bearings
Infrastructure
Results
$55,290 CJ est. value
Westfield, NY 14787

Lake Erie State Park Utility Upgrades
Infrastructure
Results
$4,566,262 CJ est. value
Brocton, NY 14716

Jamestown Public Schools Capital Project Phase 1 at Fletcher Elementary, Technical Academy and Bus Garage - BP-01 Site Work
Infrastructure
Construction
$300,000 CJ est. value
Jamestown, NY 14701

Brooks TLC Microhospital
New Construction, Infrastructure - 93,517 SF
Pending Verification
$74,000,000 CJ est. value
Fredonia, NY 14063

South Ripley Solar and Storage
New Construction, Infrastructure
Pending Verification
$348,000,000 CJ est. value
Ripley, NY 14775

Jamestown Public Schools Capital Outlay Project 2023-2024
New Construction, Infrastructure, Renovation
Bidding
$100,000 CJ est. value
Jamestown, NY 14701

New York Main Street TA Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Westfield, NY 14787

New Town Hall and Storage Building - General Construction
New Construction, Infrastructure
Results
$2,645,210 CJ est. value
Fredonia, NY 14063

French Creek Solar Power
New Construction, Infrastructure
Pending Verification
$3,376,000 CJ est. value
French Creek, NY 14724

Last Updated 01/04/2024 07:34 PM
Project Title

Wells Enterprises Ice Cream Plant Expansion

Physical Address View project details and contacts
City, State (County) Dunkirk, NY 14048   (Chautauqua County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method General Contractor to Subcontract, Bids by Invitation
Project Status All Bids Received, Selection Underway, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the manufacturing addition to an existing ice cream plant. Attached is the current site set. They added some landscaping and changed a few small things. Please indicate on pricing this week whether you used these drawings or the 12/22 drawings. Attached is the most up to date set of site drawings and scope of work. This drawing set is about 90% there and this is what we will be using for bid purposes. Please have all final bids into me as soon as possible but no later than the end of the day on Thursday January 4th. I need them to review on Friday. We will be submitting for final site plan approval next month and scheduled to start April 1st. The intent is to award the entire package but breakdown pricing per phase. Please see attached the most current set of foundation and flatwork drawings for phase 1. We are looking for solid pricing on phase 1 and projected pricing for phases 2 and 3. I have also attached the latest scope of work. Please use phase 1 details to budget phase 2 and 3. We will be awarding phase 1 foundations and flat work next month. Please have all pricing for me by the end of day Thursday the 4th. I need to be qualifying bids by Friday. I am around next week so please reach out with questions. Vertical construction will start in the spring of 2024. There will be three phases. Some trades have been awarded and other trades are still open. Interested parties should reach out the general contractor directly.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents