Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Highway 44 West Sewer Extension
Infrastructure
Bidding
$500,000 CJ est. value
Inverness, FL 34452

Highway 44 West Sewer Extension
Infrastructure
Bidding
$500,000 CJ est. value
Inverness, FL 34452

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Lead Gooseneck, Water Meter Replacements, and Isolation Valve Installations
Results
Crystal River, FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Crystal River Dialysis Center
New Construction, Renovation, Addition - 10,200 SF
Construction
$2,200,000 est. value
Crystal River, FL 34429

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

CR 491 Next-Phase Road Widening Project
Infrastructure
Pending Verification
$13,060,332 CJ est. value
Lecanto, FL 34461

CR 491 Next-Phase Road Widening Project
Infrastructure
Pending Verification
$13,060,332 CJ est. value
Lecanto, FL 34461

Cardinal Oaks
New Construction, Infrastructure
Design
$10,600,000 CJ est. value
Homosassa Springs, FL 34448

Bicentennial Park Sewer Construction Project
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Crystal River, FL 34428

District-Wide Maintenance of Continuous Deflective Separation (CDS) Units
Infrastructure
Post-Bid

Last Updated 11/29/2022 02:13 PM
Project Title

2022-23 Crystal River Street Resurfacing

Physical Address View project details and contacts
City, State (County) Crystal River, FL 34428   (Citrus County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,229,741 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City of Crystal River, Florida ("City") invites interested parties to submit a Bid to provide roadway resurfacing services for various roadways throughout City of Crystal River. The work includes, but is not limited to, furnishing all equipment, labor, and material for resurfacing all listed streets with some limited pre-milling consists of placing an average of 1", depending on condition of the road, turnout, or intersections as determined by the City, of FC-9.5 (Fine) per FDOT Section 334. The asphalt to be provided for the project shall be FDOT pre-approved and identified on the current FDOT Asphalt Mix Design Plant Assignment Sheet. WORK INCLUDES: but is not limited to, cleaning of all pavement, including exposing and cleaning edge of existing pavement, milling, paving approximately 7 miles of roadway, temporary and permanent pavement markings, installing new R.P.M.s, (reflective permanent markers) shoulder grading, sodding, the installing of stop bars, cross-walks, yellow double-center line painting, manhole and water valve riser rings, and variously located road repairs as specified in the Contract Documents for in City of Crystal River, Florida. Traffic control, mobilization, tack coat, and removal of edge of pavement debris shall be included in the tonnage price of asphalt. Contractor is responsible for providing positive drainage away from the roadway surface Bids must be accompanied by a Bid Security made payable to City of Crystal River, Florida, in an amount of five percent (5%) of the Bidder's Bid Price in the form of a certified or cashiers check or a Bid Bond. Successful Bidder shall commence work within 90 days from Notice to Proceed. Once work begins, Contractor must be substantially completed within one hundred and twenty (150) days and all work must be completed within one hundred and fifty (180) days from start-up. City and Successful Bidder recognize that time is of the essence of this Agreement and that City will suffer financial loss if the Work is not completed within the times, or by the dates, specified in the Agreement, plus any extensions. They also recognize the delays, expense and difficulties involved in proving in a legal preceding the actual loss suffered by City if the Work is not completed on time. Accordingly, instead of requiring any such proof, City and Successful Bidder agree that as liquidated damages for delay (but not as a penalty), Successful Bidder shall pay City Five hundred dollars, ($500.00) for each day beyond the Final Completion date and the Substantial Completion liquidated damage value shall be one-quarter (1/4) of the calculated liquidated damage value for each day beyond the Substantial Completion date, and for each day that expires beyond the time specified (readiness for final payment). Sundays and legal holidays shall be excluded in determining days in default. The City reserves the right to add or delete roads and/or quantities as deemed necessary. Deadline for Questions November 10th 5:00 pm

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents