Similar Projects
Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Folsom Plan Area Fire Station #34 - City of Folsom
New Construction, Infrastructure
Conception
$10,800,000 CJ est. value
Folsom, CA 95630

Poppy Grove Apartments
New Construction, Infrastructure
Design
$145,000,000 CJ est. value
Elk Grove, CA 95757

Construct Two Auxiliary Lanes and Upgrade Four Ramp Metering Systems
Infrastructure, Alteration
Design
$17,583,000 est. value
Elk Grove, CA 95758

Construct Curb Ramps, Sidewalks and Modify Signal Systems
Infrastructure
Bidding
$2,520,000 CJ est. value
Sacramento, CA 95829

Roadway Excavation, Place CL2 AB, HMA & RHMA, & Modify Ramp Meters
Infrastructure
Bidding
$28,000,000 CJ est. value
Sacramento, CA 95834

Rio Linda Elementary School Waterline Replacement Project
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Rio Linda, CA 95673

Frontier Elementary School Outdoor Learning Shade Structure Project
Renovation
Sub-Bidding
$315,000 CJ est. value
Sacramento, CA 95842

Northpointe K-5 Dual Immersion School
New Construction
Post-Bid
Sacramento, CA 95834

Rio Americano High School CTE Modernization
Renovation, Alteration
Post-Bid
CA

On-Call Drilling and Well Installation Services for City Landfills
Term Contract, Alteration
Results
Sacramento, CA

Arcade Fundamental Middle School New Construction
New Construction
Results
$53,000,000 est. value
Sacramento, CA 95821

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 1,200 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Last Updated 08/17/2022 02:03 PM
Project Title

Security Fencing Projects at Seven School Sites

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95814   (Sacramento County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,847,222 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The total estimate for this project is $1,415,000.00. This total estimate is broken down as shown per individual schools below: Caroline Wenzel Estimate $145,000.00 Genevieve F. Didion E.S. Estimate $135,000.00 Martin Luther King Jr. Estimate $95,000.00 Albert Einstein M.S. Estimate $500,000.00 John Bidwell E.S. Estimate $405,000.00 Mark Twain E.S. Estimate $90,000.00 Sol Aureus College Prep. Estimate $45,000.00 Firms that are not currently prequalified must submit a prequalification application by May 12, 2022. Applications must be approved by May 19, 2022. Multiple Locations Are Available In This Project

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents