Similar Projects
I-78 - Easton Rd to SR 33
Infrastructure, Renovation
Conception
$21,935,774 CJ est. value
Bethlehem, PA 18015

Dual Bridges over Easton
Infrastructure, Renovation
Conception
$61,439,000 CJ est. value
Bethlehem, PA 18015

Nor-Bath Trail Improvements - Phase 3
Infrastructure
Design
$200,000 CJ est. value
Bethlehem, PA 18017

Bushkill Pump Station Upgrade
Renovation, Infrastructure
Design
$200,000 CJ est. value
Easton, PA 18042

2022 Seal and Slurry
Infrastructure
Bidding
$300,000 CJ est. value
Allen Township, PA 18067

Pen Argyl School District New Maintenance Building At Wind Gap Middleschool - General Construction, Electrical Construction, and Plumbing Construction
New Construction, Infrastructure
Bidding
$60,000 CJ est. value
Pen Argyl, PA 18072

AutoZone #1400 / Bethlehem
New Construction, Infrastructure - 5,654 SF
Post-Bid
$1,500,000 CJ est. value
Bethlehem, PA 18015

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Hecktown Road Water Main Relocation
Results
Bethlehem, PA 18018

Water Main Work
Results
Bethlehem, PA 18018

2022 36 Minsi Trail Siphon South Access Improvements
Infrastructure
Construction
$77,400 CJ est. value
Bethlehem, PA 18018

Banana Factory Arts & Education Center / Bethlehem
Demolition, New Construction, Infrastructure - 73,485 SF
Pending Verification
$22,000,000 CJ est. value
Bethlehem, PA 18015

Broad Street Mixed Use Building
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Bethlehem, PA 18018

Resurfacing Main_Washington Street
Infrastructure
Conception
$2,280,140 CJ est. value
Bethlehem, PA 18020

SR 1015 o/Martins Creek
Demolition, New Construction, Infrastructure
Design
$3,778,299 CJ est. value
Nazareth, PA 18064

Last Updated 08/24/2022 02:10 PM
Project Title

West Goepp Street Storm Sewer

Physical Address View project details and contacts
City, State (County) Bethlehem, PA 18018   (Northampton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $184,550 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 24, 2022 project is canceled and it will be rebid. No specific date for rebid. Clarification deadline 7/11/2022 12:00 PM The Work to be performed for the 2022 37 West Goepp Street Storm Sewer Project consists of the following: Provide materials and labor to install 2 catch basins and 4 manholes to intercept stormwater from West Goepp Street and convey underground to an existing storm sewer on West Spruce Street, as more particularly specified in the Contract Documents. The Bid for the 2022 37R West Goepp Street Storm Sewer Project (PROJECT) shall be accompanied by Bid Security in the amount of ten percent (10%) of the total amount of the Bid in the form of a certified check, bank money order, or bid bond. All Bids shall be effective for sixty (60) calendar days from the date of the Bid opening, unless an award of the contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant, in which case all bids shall remain effective for one hundred twenty (120) calendar days from the date of the Bid opening. On or before the last day during which bids shall be effective, if a contract will be awarded it shall be awarded to the lowest responsible bidder. After issuance of the Notice of Award, such contract must be completed within 90 calendar days from the date of the Notice to Proceed. The successful bidders will be required to provide Construction Performance and Payment Bonds equal to 100% of the contract amount as specified in the contract documents, which bonds shall also cover a 1-year correction period which will commence upon completion of the Work. This project is subject to certain special requirements. For example, as more specifically detailed in the Contract Documents, the successful bidder shall be required to (a) assure protection against discrimination for employees, applicants for employment, and subcontractors on the grounds of actual or perceived race, color, sex, religion, ancestry, genetic information, national origin, sexual orientation, gender identity or expression, familial status, marital status, age, mental or physical disability, use of guide or support animals and/or mechanical aids; (b) pay certain minimum salaries and wages; and ( c) . OWNER reserves the right to accept or reject any or all Bids or portions thereof.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents