Similar Projects
Bonneville Dam Sluiceway Gate Replacement
Renovation
Post-Bid
Cascade Locks, OR 97014

Willamette Falls Locks (WFL) Seismic and Safety Upgrades
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
West Linn, OR 97045

McNary Lock & Dam - Structural Steel Heat Straightening
Renovation
Post-Bid
Umatilla, OR 97882

Reservoir Replacement Project at Detroit Lake State Park
New Construction
Results
$475,000 est. value
Detroit, OR 97342

McNary Drainage, Unwatering, and Equalization System Rehab
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
Umatilla, OR 97882

John Day Dam Turbine Runner Replacement and Generator Rewind Project - Industry Site Visit
Renovation
Design
$500,000,000 est. value
Rufus, OR 97050

Fishhawk Lake Dam Spillway and Fish Passage Improvements
Renovation
Results
$3,500,000 to $3,900,000 est. value
Westport, OR 97016

Cougar Butterfly Valve Replacement
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Blue River, OR 97413

McNary Lock & Dam - Stoplog Seals and Molds
Renovation
Post-Bid
Umatilla, OR 97882

John Day Dam Turbine Runner Replacement and Generator Rewind Project - 90% Review
Renovation, Term Contract
Post-Bid
$500,000,000 est. value
Rufus, OR 97050

Reported 03/01/2022 12:00 AM
Project Title

Mcnary Navigation Lock Downstream Gate Gudgeon Anchor Replacement

Physical Address View project details and contacts
City, State (County) Umatilla, OR 97882   (Umatilla County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking sources for a construction project entitled: McNary Navigation Lock Downstream Gate Gudgeon Anchor Replacement: roposed work is located at McNary Lock and in Umatilla, Oregon. The work will be for the McNary downstream gate that was placed in service in 1954. The downstream gate is a two-leaf arched miter gate that measures 106 feet tall by 86 feet wide and each gate leaf weighs approximately 400-tons. The existing gudgeon anchors have exceeded the recommended fatigue life and are programmed for full replacement in a 2024 extended navigational lock outage. USACE installed permanent instrumentation in 2019 to monitor the overall health of the gate and gudgeons. The work involved includes the replacement of all four imbedded gudgeon anchors and mechanical linkages to fit up to the existing gate. New post tensioned anchor rods will be installed by drilling or coring to provide aligned holes with backer plates and transition plates that engage the concrete monolith to support the weight of the operating miter leaf gates. The post tensioned rods will be connected by a new five-point gudgeon pin system and mechanical linkages. The new gudgeon five-point linkage will be designed to support the existing miter leaf gates as well as the new replacement gates planned as a future contract. The components for this project are drilled/cored aligned holes, post tensioning rods, mechanical linkages, work within tight scheduled outages, and inclement winter weather conditions.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents