Similar Projects
Underground Storage Tank Fill-In-Place
Bidding
IL

Z2NE--Upgrade Facility Water - Smith Hafeli Inc - MA VA Medical Center
Post-Bid
Marion, IL

Water Tower Cleaning
Term Contract
Post-Bid
Oswego, IL 60543

Elevated Water Storage Tank
Results
Gardner, IL 60424

Elevated Tank Improvements
Results
Pecatonica, IL 61063

Water Tower Cleaning
Post-Bid
Colona, IL

State Street And Seven Hills Elevated Water Storage Tanks Rehabilitation
Renovation
Results
O'Fallon, IL 62269

New 250,000 Gallon Elevated Water Storage Tank
Post-Bid
Less than $1,310,000 est. value
Carrollton, IL

First Street Water Treatment Plant Brine Tank Replacement
Renovation
Results
Less than $480,000 est. value
Woodstock, IL 60098

Protective Coating Restoration for 500,000 Gallon Elevated Water Storage Reservoir Along with Ground Storage Reservoir and Miscellaneous Concrete at Water Treatment Plant
Post-Bid
Centralia, IL

Southwest Elevated Tank Repairs
Results
Less than $440,000 est. value
Belvidere, IL 61008

Water System Improvements Division 2: Water Tower Rehabilitation
Post-Bid
Blue Mound, IL

New Ground Water Storage Tank
New Construction, Demolition
Results
Loda, IL 60948

100,000 Gallon Elevated Tank Rehabilitation
Post-Bid
Marion, IL

Service Upgrades to Facility Water Tower
Results
Marion, IL 62959

Last Updated 09/22/2020 05:04 PM
Project Title

Water Tank, Hydronic Pump and Vav Box Upgrades at Independence Grove

Physical Address View project details and contacts
City, State (County) Libertyville, IL 60048   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the demolition of the existing water storage tank and its concrete supports, Air Compressor and 3 inch line. Also demo two inline pumps, two triple duty valves and two pipe reducers. Provide all parts and labor for the installation of a new Water Tank, Hydronic Pump and VAV Box Upgrades.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents