Similar Projects
2022 Tar and Chip Project
Infrastructure
Design
$30,000 CJ est. value
Parryville, PA 18244

Installation of Bollards at Entrances to All District Schools
Infrastructure
Design
Lykens, PA 17048

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Osmond Lecture Hall Renovation
Renovation
Sub-Bidding
$2,400,000 CJ est. value
State College, PA 16801

Installation of a Manure Storage
Renovation
Sub-Bidding
$282,000 CJ est. value
North Shenango Township, PA 16424

Precast Concrete Inlets and Risers
Alteration
Post-Bid
Carnegie, PA

Fairview Hills Concrete Revitalization Project Phase II
Alteration
Post-Bid
Altoona, PA 16601

Transfer Station Complex Tipping Floor Repair Project
Alteration
Results
Lancaster, PA 17603

2021 Inlet Procurement Project
Alteration
Results
Hazleton, PA

Hawkins Avenue Bridge Over Sixth Street Structural Repairs and Rehabilitation Borough of North Braddock Re-Bid
Infrastructure
Bidding
$250,000 CJ est. value
Braddock, PA 15104

Cold Storage Building Heat and Insulation
Renovation
Sub-Bidding
State College, PA 16801

Portland Concrete
Alteration
Post-Bid
Chambersburg, PA

Airport Road Recreation Area - Pavilion And Landscaping
Alteration
Results
Bethel, PA

Roadway and Bridge Reconstruction
Demolition, New Construction, Infrastructure
Bidding
$999,999,999 CJ est. value
Levittown, PA 19056

Last Updated 07/13/2023 02:07 PM
Project Title

Wastewater Treatment Facility Replacement - Mechanical & Electrical Work

Physical Address View project details and contacts
City, State (County) Hopewell, PA 16650   (Bedford County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves upgrades and additions to the Hopewell wastewater treatment facility including influent pump station, packaged extended aeration wastewater treatment plant process, solids holding tanks/aerobic digesters, ultraviolet disinfection system and post aeration facilities, chemical feed and storage systems, electrical room addition, earthwork, mechanical piping and equipment, yard piping, instrumentation control and monitoring system, HVAC work, plumbing work, electrical work, building architectural work, structural steel and reinforced concrete construction, site improvements and all required appurtenances. The Contractor is subject to the provisions of the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended as well as American Iron and Steel Requirements as amended, Build America, Buy America Requirements and Infrastructure Investment and Jobs Act. The Act and amendments require that the Contractor use or furnish only steel products {as defined in the Act and amendments) which have been produced in the United States. A certified check or bank draft, payable to the order of the Bedford County Board of Commissioners, or negotiable U.S. Government bonds {at par value), or a satisfactory Bid Bond executed by the Bidder and a surety named in the current list of acceptable sureties published in U.S. Treasury Department Circular 570 {amended), in the amount equal to ten percent {10%) of the total Bid shall be submitted with each Bid CDBG-21C-82953 MBEGoal: 5.0% WBE Goal: 3.0% The Successful Bidder will be required to execute the Agreement and to furnish Performance and Payment bonds, each of said bonds to be in the amount of one hundred percent ( 100%) of the Contract Price, all in the respective forms provided in the Bidding Documents. The Contractor also will be required to furnish evidence of insurance coverage as required by the Bidding Documents. l questions about the meaning or intent of the Bidding Documents are to be directed to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda, mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents