Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Roadway Improvements - GPC
Infrastructure
Bidding
$1,920,000 est. value
Union Grove, WI 53182

2022 Sidewalk Improvements
Infrastructure
Bidding
McFarland, WI

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

Motor Vehicles Storage Compound Expansion
Results
$700,000 est. value
Mosinee, WI 54455

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Construction
Fitchburg, WI 53711

C. Kaukauna, Island Street, Power Canal Tail Race
Infrastructure
Bidding
WI

2021 Curb, Gutter and Sidewalk
Term Contract
Post-Bid
Reedsburg, WI

Great Headwaters Trail 3 and 2
Results
Phelps, WI 54554

2022 Utility Improvements USH 61/STH 35
Infrastructure
Bidding
Potosi, WI

Wisconsin Avenue Sidewalk
Post-Bid
Grand Chute, WI

Sunset Ridge Drive
Results
$308,338 est. value
Stratford, WI 54484

Middleton Beach Road Reconstruction
Infrastructure
Bidding
Middleton, WI 53562

Last Updated 01/05/2022 02:33 PM
Project Title

2021 Utility Improvement - Street Reconstruction-Curb and Gutter/Sidewalk and Driveway

Physical Address View project details and contacts
City, State (County) Monroe, WI   (Green County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Alternate A – 15TH Avenue (9th to 12th Street) & 14th Street (20th to 23rd Avenue) 2000 L F Install new 30” conc. curb & gutter 1300 s f install new 6” conc. sidewalk including drive approaches 1200 s f install new 4” conc. sidewalk including handicap ramps 160 l f remove and replace 30” conc. curb & gutter 2400 s f remove and replace 6” conc. sidewalk 1400 s f remove and replace 4” conc. sidewalk Alternate B – 15TH Avenue (9th to 12th Street) 1100 L F Install new 30” conc. curb & gutter 600 s f install new 6” conc. sidewalk including drive approaches 700 s f install new 4” conc. sidewalk including handicap ramps 80 l f remove and replace 30” conc. curb & gutter 1200 s f remove and replace 6” conc. sidewalk 800 s f remove and replace 4” conc. sidewalk

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents