Similar Projects
2023 Dye Water Flooding Project
Infrastructure
Bidding
$70,000 CJ est. value
Shorewood, WI 53211

21st Street S Curb and Gutter With Utilities
Infrastructure
Bidding
$500,000 CJ est. value
La Crosse, WI 54601

Boiler Bottom Blowdown Valve Replacement
Renovation
Sub-Bidding
$109,000 CJ est. value
Allouez, WI 54301

Parking Drain Replacement Single Trade Contract - Plumbing
Infrastructure
Sub-Bidding
$2,544,000 CJ est. value
Madison, WI 53715

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Private Property Inflow And Infiltration Reduction - Residential Plumbing Contractors
Term Contract
Post-Bid
Milwaukee, WI

Northwest Restroom Facility MEP
Renovation, Alteration - 3,500 SF
Results
$2,336,300 est. value
West Allis, WI 53214

2022 Sanitary Sewer Lining Mayer Street Area
Infrastructure
Results
$402,130 CJ est. value
Neenah, WI 54956

2022 Lead Service Line Replacement
Infrastructure
Construction
$581,013 CJ est. value
Hartford, WI 53027

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Kewaskum School Cooler Expansion
Infrastructure, Alteration
Post-Bid
$100,000 est. value
Kewaskum, WI 53040

Welding Lab MEP Relocations for Equipment Connections
Alteration
Results
$200,000 est. value
Appleton, WI 54914

Exterior Envelope Repair - Lathrop Hall and Van Vleck Hall
Renovation
Construction
$5,290,000 CJ est. value
Madison, WI 53706

Pumping of Grease Traps and Catch Basins
Alteration
Post-Bid
River Falls, WI

PSTC Propane Piping Replacement
Alteration
Results
$700,000 est. value
Appleton, WI 54914

Last Updated 06/22/2023 03:12 PM
Project Title

Growing Wings Utility Extension

Physical Address View project details and contacts
City, State (County) Somerset, WI 54025   (Saint Croix County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $248,480 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Sanitary Sewer (Gravity), Sewer Pump Station, Sewer Force Main, Sewer and Water Construction, Sitework/Excavating and Grading, Utility Street Construction and Excavation Description: The work consists of water main, sanitary sewer, and force main utility extensions with associated work. The work includes the following approximate quantities for construction: Low Pressure Sewer, DR 11 HDPE, 1.25-Inch 220 LF Low Pressure Sewer, DR 11 HDPE, 4-Inch 200 LF 8-Inch PVC Sanitary Sewer 320 LF Sanitary Manhole 1 EA Grinder Pump Station, Complete 1 LS 6-Inch Water main 40 LF 8-Inch Water main 305 LF 12-Inch Water main 230 LF Additional Description: The anticipated substantial completion date is 9/2/2023 and final completion date is 9/9/2023. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 60 Plato Boulevard East, Suite 140, St. Paul, MN 55107-1835The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents