Similar Projects
Alameda County Fire Department Training Center - #20142 - Alameda County
New Construction, Infrastructure
Conception
$30,056,880 CJ est. value
Dublin, CA 94568

7TH/Anthony Traffic Signal Project - PWTRCT1605 - City of Berkeley
Infrastructure, Alteration
Conception
$1,414,500 est. value
Berkeley, CA 94710

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Grayson Street Life Sciences Facility Development
New Construction, Infrastructure - 187,000 SF
Design
$63,000,000 CJ est. value
Berkeley, CA 94710

Water Pollution Control Plant Dirt Relocation 2021
Infrastructure
Bidding
$4,000,000 CJ est. value
San Leandro, CA 94577

High Friction Surface Treatment
Infrastructure
Bidding
$3,540,000 CJ est. value
Sunol, CA 94550

Preconstruction and Lease-Leaseback Services
New Construction
Post-Bid
Berkeley, CA 94703

SSM-THUP Project General Trades Contractor
New Construction, Alteration - 46,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Berkeley, CA 94703

California School for The Deaf - Fremont Middle School Activity Building
New Construction
Results
$1,793,100 est. value
Fremont, CA 94538

Berkeley High School Classroom Building A Project
Renovation
Results
$1,500,000 est. value
Berkeley, CA 94704

Arroyo High School New Building Part Two
New Construction
Construction
San Lorenzo, CA 94580

Shattuck Avenue Apartments
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Berkeley, CA 94704

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Admirals Cove Infill
Demolition, New Construction, Infrastructure - 348,850 SF
Pending Verification
$72,011,310 CJ est. value
Alameda, CA 94501

Piling Replacements - PRWT122012 - City of Berkeley
New Construction, Infrastructure
Conception
$1,500,000 est. value
Berkeley, CA

Last Updated 10/11/2022 11:32 AM
Project Title

Achieve Academy - GMP Proposal

Physical Address View project details and contacts
City, State (County) Oakland, CA 94601   (Alameda County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from Design-Build Firm
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project scope includes demolition of one (1) existing school building and the removal of fourteen (14) relocatable on the existing Achieve Academy campus, the construction of a new, 2-story, wood frames, fully sprinklers classroom building (building B), and limited improvement to the existing school building on 17th St. (building A). Building B is approximately 22,000 SF, includes 19 standard classrooms, 1 flex room, and associated administrative and support spaces. The existing building A is an approximately 27,000 SF modernization includes accessibility and barrier removal improvements at toilet rooms and minor changes at classrooms. Site work includes new play areas and staff parking lot. Schedule: Start – May 2023 Finish – August 2024 Skilled & Trained Labor Force and Prevailing Wage requirements. EFCPS’ Facility Use Agreement with OUSD states that the project will make its best efforts to comply with District Administrative Regulation and Board Policy 7115 (‘Capital Program / Construction Related Local, Small Local and Small Local Resident Business Enterprise Program, and Board Policy’), shall adopt a local and hiring local small business participation program, and agree to at least 25% local hiring/local business participation for all improvements. Participation is also encouraged from small, women and minority-owned and local businesses (located in Oakland, CA).

Details

,, 49,000 SF - 2 Stories Above Grade, 22,000 SF. 27,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents