Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Permanent Emergency Bypass Transmission Main on East Third Avenue (FY 2025-2026) - WA-04 - City of Foster City
Infrastructure
Conception
$300,000 est. value
Foster City, CA 94404

435 East 3rd Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 33,876 SF
Design
$9,000,000 CJ est. value
San Mateo, CA 94401

Glens Path Project - Phase 2
Infrastructure
Design
$200,000 CJ est. value
Woodside, CA 94062

Bayfront Park Sanitary Sewer Improvement
Infrastructure
Bidding
$3,642,388 CJ est. value
Menlo Park, CA 94025

Bayfront Park Sanitary Sewer Improvement
Infrastructure
Bidding
$3,642,388 CJ est. value
Menlo Park, CA 94025

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Replacement of 8-Inch Pipeline Under Pilarcitos Creek (Strawflower) Project
Alteration
Post-Bid
$372,000 est. value
Half Moon Bay, CA 94019

Avenues Three and One Sewer and Water Main Replacement
Infrastructure
Results
San Bruno, CA

2021-2022 Watermain Replacement Project - Brookline
Alteration
Results
$693,000 to $75,000 est. value
Redwood City, CA

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

MBC BioLabs / San Carlos
New Construction, Infrastructure - 152,582 SF
Construction
$40,000,000 CJ est. value
San Carlos, CA 94070

Gateway of Pacific Phase 4
Demolition, New Construction, Infrastructure - 345,842 SF
Pending Verification
$88,000,000 CJ est. value
South San Francisco, CA 94080

222 Gateway Terrace Condominiums
Demolition, New Construction, Infrastructure - 54,445 SF
Pending Verification
$15,000,000 CJ est. value
San Mateo, CA 94401

Gravity Mains along Mitten Avenue, Gilbreth, and Stanton - City of Burlingame
Infrastructure
Conception
$2,088,000 est. value
Burlingame, CA

Last Updated 10/12/2022 06:34 PM
Project Title

Cabrillo Highway Phase 1B-3b, Phase 4 - Montara Water And Sanitary District

Physical Address View project details and contacts
City, State (County) Montara, CA 94019   (San Mateo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $5,195,985 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Cabrillo Highway Phase 1B-3b, Phase 4 A detailed scope is not available. Project is included in the Montara Water & Sanitary District's FY 2022 - 2027 Budget CIP. As of October 12, 2022 information regarding a design team or a general contractor is not available. Funding is anticipated from 2022 to FY 2027.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents